Soil contamination survey of the former automobile repair shop site | Geotech
Soil contamination survey
Eliminate contamination risks during dismantling through legal measures and ensure stable construction timelines.
The demolition of the site of an automobile maintenance factory involves the removal of building materials, which always carries the risk of soil contamination due to substances used in the past. If it violates soil disposal regulations or administrative guidance, it could lead to serious situations such as construction suspension or damage to corporate credibility. GeoTech's comprehensive soil contamination investigation anticipates and eliminates these regulatory risks, designing a lawful investigation plan to ensure the successful completion of the project. 【Applicable Targets】 - Demolition work at the site of an automobile maintenance factory - Removal of building materials involving large-scale land alteration - Sites requiring compliance with soil disposal regulations 【Expected Outcomes】 - Lawful response to administrative guidance and regulations - Reduction of construction suspension risks - Maintenance of corporate social credibility
Inquire About This Product
basic information
【Features】 - Highly reliable surveys conducted by a Ministry of the Environment designated investigation agency - Consistent survey response from Phase 1 to Phase 3 - High-density sampling that meets the standards of various prefectural ordinances - Rapid issuance of official analysis results by our in-house analysis laboratory - Addressing hazardous substances such as trichloroethylene, lead, and cadmium 【Our Strengths】 Geotech provides "engineering services for ground and foundations" and is also involved in soil contamination investigation and remediation projects. With extensive experience and proven technology, we offer a one-stop service tailored to our clients' needs under the philosophy of creating the future of cities from the ground up.
Price information
-
Price range
P3
Delivery Time
P4
Applications/Examples of results
The main purpose is the lawful execution of the order investigations under Articles 4 and 5 of the law associated with the notification of land use changes for the dismantling of automobile maintenance factories and the development of the site (for developments of 3,000 square meters or more, or 900 square meters or more within the factory premises), as well as the facilitation of administrative consultations based on various environmental protection ordinances. It will be introduced with the aim of obtaining development permits without delay. Additionally, for the large amounts of excavated soil transported from construction sites in the metropolitan area, it can be widely utilized for reliable schedule management and compliance in on-site practices, including pre-transport lot inspections that comply with the "no reuse of existing data" rule set by disposal destinations and municipalities, as well as obtaining conformity certificates for full-layer equal quantity sampling in accordance with various residual soil ordinances in Chiba Prefecture, Saitama Prefecture, etc. (leaching tests for 28 items and content tests for 2 items).
catalog(3)
Download All Catalogs
Company information
-






![Dry Wave Retractable Indoor Clothes Drying Rack [Good Design Award Winner]](https://image.www.ipros.com/public/product/image/600/2000331235/IPROS31366560678415915313.jpeg?w=280&h=280)

![[Proposal] Bird Damage Prevention (Wire Type) Altima Bird Prevention Wire](https://image.www.ipros.com/public/product/image/2032865/IPROS2629637137718331190.jpg?w=280&h=280)