ETP method | Achieving environmental conservation and cost reduction without soil disposal
Ground reinforcement work
Zero residual soil and low noise ETP method. Prevents soil contamination without using cement. A ground reinforcement technology that contributes to reducing disposal costs and shortening construction periods.
The ETP method is a ground reinforcement technology that aims to reduce environmental impact and optimize costs through non-dredging and low-noise construction. In urban areas and densely populated residential areas, issues such as differential settlement measures, noise and vibration, increased disposal costs for surplus soil, and the risk of soil contamination from cement are challenges. This method involves the rotary insertion of a steel pipe equipped with a disc wing and excavation auxiliary bit. Since it does not use cement milk, it generates no surplus soil or industrial waste, significantly reducing disposal costs and removal work. The use of compact equipment minimizes noise and vibration, mitigating the impact on nearby residents. It accommodates 16 sizes of pile diameters ranging from φ89.1mm to φ609.6mm and possesses sustainability features that allow for removal and recovery in reverse rotation during future demolition. Under the strict quality control of Geotech Co., Ltd., it achieves ground reinforcement that balances environmental conservation and economic efficiency.
Inquire About This Product
basic information
The ETP method is an environmentally friendly steel pipe pile construction technique that has received certification from the Minister of Land, Infrastructure, Transport and Tourism and the GBRC Building Technology Performance Certification (No. 12-20). It offers a lineup of shaft pile diameters ranging from φ89.1mm to φ609.6mm (a total of 16 sizes), and the selection of high-strength 590N grade steel pipes is also possible. The tip wings are disc-shaped, allowing for smooth rotational penetration, with a maximum construction depth of 63.6m in sandy soil (130 times the outer diameter) and 59.43m (or 57.0m) in clayey soil. Due to the no-dirt and no-curing construction method, it allows for immediate transition to the next process right after pouring, boasting high on-site efficiency.
Price information
Delivery Time
Applications/Examples of results
It is ideal for new foundation reinforcement work for single-family homes in densely populated residential areas and urban settings, low to mid-rise condominiums, commercial facilities, and factories. It demonstrates significant cost reduction effects with zero industrial waste in narrow sites where space for soil disposal cannot be secured and in urban construction where truck access is restricted. Additionally, it is widely used around schools and hospitals where vibrations, noise, and soil and groundwater contamination must be absolutely avoided, in the construction of factories for companies that have obtained ISO 14001 certification, and in temporary structures or rental properties that assume pile removal for future site reuse.
catalog(3)
Download All Catalogs
Company information
-


![[For Real Estate] Ground Reinforcement Work | Small-Diameter Steel Pipe Pile Method | Geotec Co., Ltd.](https://image.www.ipros.com/public/product/image/321794/IPROS1093147343429230281.jpg?w=280&h=280)



![Dry Wave Retractable Indoor Clothes Drying Rack [Good Design Award Winner]](https://image.www.ipros.com/public/product/image/600/2000331235/IPROS31366560678415915313.jpeg?w=280&h=280)

![[Proposal] Bird Damage Prevention (Wire Type) Altima Bird Prevention Wire](https://image.www.ipros.com/public/product/image/2032865/IPROS2629637137718331190.jpg?w=280&h=280)