We will renovate the deck of the pedestrian bridge on the major trunk road where regulation is difficult!
We handle "aluminum deck panels for pedestrian bridge renovation work." Each panel weighs approximately 70 kg (1.3m × 1.95m) and can be handled manually. This eliminates the need for large-scale road closures associated with pedestrian bridge renovations. Four people can transport and install it, allowing for a short installation period. Please feel free to contact us when you need assistance. 【Features】 ■ Can be transported manually ■ Can be installed in a short period ■ Reduces dead load *For more details, please download the PDF or feel free to contact us.
Inquire About This Product
basic information
【Construction Procedure】 ■ The deck plates are cut into smaller pieces for transportation. ■ Installation of aluminum floor plate mounting brackets and side ditches, as well as repainting, is also carried out. ■ Aluminum floor plates are brought in using heavy machinery. ■ Temporary placement. ■ Installation by manual labor. *For more details, please download the PDF or feel free to contact us.
Price range
Delivery Time
Applications/Examples of results
For more details, please download the PDF or feel free to contact us.
Company information
Sumitomo Light Metal Industries, Ltd. Engineering Co., Ltd. was established as a joint venture on August 1, 2000, through the integration of the Urban Engineering Division of Sumitomo Light Metal Industries, Ltd. (now UACJ Corporation) and the Landscape Engineering Division of Japan Light Metal Co., Ltd., which were both spun off. In 2020, marking its 20th anniversary, the company changed its name to Nikkei Engineering Co., Ltd. as a new member of the Japan Light Metal Group. "A beautiful town and your aluminum future." We aim to be a company whose mission is to enrich the future of towns and people by combining aluminum and technology.





