This is an example of achieving effective repairs within a limited budget through detailed investigations and the prioritization of repair needs.
We received an inquiry from a local government stating, "There are several aging bridges within our jurisdiction, but we lack the basis for determining which ones should be repaired first, and we are struggling with budget applications." It was required to conduct a detailed survey and condition assessment of all bridges to objectively organize the repair priorities. In this case, we performed detailed inspections and condition evaluations of multiple bridges and created reference materials for repair plans based on urgency and priority. These materials were also utilized for explanations to the council, leading to budget allocation and planned repair implementation.
Inquire About This Product
basic information
【Case Summary】 - Target Facility: Municipal Managed Bridges (Comprehensive Detailed Survey of Multiple Bridges) - Survey Content: Close Visual Inspection, Sound Testing, Condition Assessment - Provided Results: Condition Assessment List, Repair Priority Organization Materials, Visualization Materials for Council Explanation 【Challenges and Results】 - Challenge: There was no organized data to support the priority of repairs. - Result: Organized repair priorities through objective condition assessment. Utilized for budget application and council explanation.
Price information
Individual estimate The cost varies depending on the content of the investigation, the scale of the facility, site conditions, and the type of deliverables. Please feel free to consult with us first.
Applications/Examples of results
【Purpose】 - Evaluation of the condition of multiple facilities and organization of repair priorities - Preparation of supporting documents for budget requests and council explanations - Development of effective repair plans within a limited budget 【Examples of Achievements】 - Case studies of municipalities that conducted comprehensive detailed surveys of aging bridges and organized repair priorities - Examples utilizing condition evaluation materials - *Details of achievements will be provided in documents or upon inquiry.
catalog(1)
Download All CatalogsCompany information
Since its establishment in 1966, East Japan Construction Consultant has been proposing "aha!" moments centered around surveying and design technology for many years. Starting with surveying and expanding into design, land acquisition, compensation, and infrastructure maintenance, we have worked as a comprehensive construction consultant to enhance our services. We have been engaged in the development and maintenance of social infrastructure that supports people's safety, security, and economic activities, including roads, rivers, ports, marine surveys, urban planning, and energy. Currently, in addition to our efforts in disaster prevention, mitigation, and national resilience, we are also focusing on digital transformation (DX) through initiatives such as BIM/CIM, AI, UAVs, and ROVs (underwater drones).

