This is an example of undertaking regular inspections of road tunnels and establishing a maintenance management foundation through the development of deformation maps and ledger maintenance.
We received an inquiry from a road administrator stating, "We are conducting regular inspections of the tunnels within our jurisdiction, but the records are scattered across each inspection, making it difficult to grasp the progress of any changes." Along with the implementation of the inspection survey, we were asked to standardize the records, organize the ledger, and create comparative materials for changes over time. In this case, we conducted close visual inspections and sound tests, and created standardized formats for the change development diagrams, photo ledger, and inspection reports. We also prepared comparative materials with past records, which were utilized to identify areas of change and prioritize sections for repairs.
Inquire About This Product
basic information
【Case Overview】 - Target Facility: Tunnel managed by road administrators (comprehensive inspection of multiple tunnels) - Inspection Method: Close visual inspection and sound testing - Provided Results: Deformation development diagrams (for all sections), photo ledger, inspection report, comparative materials on changes over time 【Challenges and Achievements】 - Challenge: Inspection records are dispersed, making it difficult to grasp the progression of deformations - Achievement: By developing standardized deformation development diagrams and ledgers, it has become possible to understand changes over time and identify priority sections for repairs.
Price information
Individual Estimate Costs vary depending on the content of the investigation, the scale of the facility, site conditions, and the type of deliverables. Please feel free to consult with us first.
Applications/Examples of results
【Purpose】 - Contracting for regular tunnel inspections / annual commissions - Standardization and maintenance of deformation development diagrams and ledgers - Understanding of aging changes and organization of repair priority sections 【Examples of Achievements】 - Cases where progress in deformation was identified through standardized record maintenance - *Details of achievements will be provided in materials or upon inquiry.
catalog(1)
Download All CatalogsCompany information
Since its establishment in 1966, East Japan Construction Consultant has been proposing "aha!" moments centered around surveying and design technology for many years. Starting with surveying and expanding into design, land acquisition, compensation, and infrastructure maintenance, we have worked as a comprehensive construction consultant to enhance our services. We have been engaged in the development and maintenance of social infrastructure that supports people's safety, security, and economic activities, including roads, rivers, ports, marine surveys, urban planning, and energy. Currently, in addition to our efforts in disaster prevention, mitigation, and national resilience, we are also focusing on digital transformation (DX) through initiatives such as BIM/CIM, AI, UAVs, and ROVs (underwater drones).

