Renewed for a safe and comfortable elevator! We have plans suitable for your needs.
We would like to introduce the four types of elevator renewal plans that we propose. Starting with the "Partial Removal Renewal" plan, which has a construction period of approximately 30 days, we also offer the "New Safety Standards Renewal" with a construction period of about 15 days, the "Control and Hoisting Machine Renewal" with a construction period of about 8 days, and the "Control and Hydraulic Renewal" with a construction period of about 10 days. In addition, we have plans suitable for various uses such as for sleeping cars, freight, and small cargo. Our company has also obtained strict standards and certifications. 【Plans】 ■PLAN G: Partial Removal Renewal ■PLAN S-1: New Safety Standards Renewal ■PLAN B: Control and Hoisting Machine Renewal ■PLAN H: Control and Hydraulic Renewal *For more details, please download the PDF or feel free to contact us.
Inquire About This Product
basic information
For more details, please download the PDF or feel free to contact us.
Price range
Delivery Time
Applications/Examples of results
For more details, please download the PDF or feel free to contact us.
catalog(1)
Download All CatalogsCompany information
As a company specializing in elevator renewal, we cater to all applications, from passenger elevators for office buildings to bed elevators for hospitals and welfare facilities, as well as large freight elevators for factories and warehouses. Since elevators are used for a long time, we propose appropriate maintenance and promise peace of mind with our comprehensive support system and advanced technological capabilities. Please feel free to contact us if you have any requests.