Bridge section: OSK suspended scaffolding for use in areas where bridge inspection vehicles cannot be used.
Even if you are not a skilled worker, you can safely remove scaffolding and perform touch-up work at the same time!
Our company offers the "OSK Method" for bridge construction. In general construction methods, work over rivers requires the use of a bridge checker, necessitating traffic restrictions. However, the slide method allows for the bridge pier sections to be extended without the use of a bridge checker, eliminating the need for traffic restrictions. Additionally, with the slide bazooka, the direction of the scaffolding boards can be changed freely without any steps. 【Features of the OSK Method】 ■ Can be extended using standard temporary materials ■ Reduces construction-related work and overall construction costs ■ Decreases traffic restrictions, which is expected to alleviate congestion ■ Can install suspended scaffolding in narrow roads or locations where construction vehicles cannot enter *For more details, please download the PDF or feel free to contact us.
Inquire About This Product
basic information
【Other Features of OSK Construction Method】 ■ No traffic restrictions are required, allowing for cost reduction ■ The number of necessary aerial work platforms can be reduced ■ In locations where assembly from below is not possible due to rivers or other obstacles, scaffolding can be installed using the sliding method *For more details, please download the PDF or feel free to contact us.
Price range
Delivery Time
Applications/Examples of results
【Solving Such Concerns】 ■ I want to install scaffolding in places like rivers where it is not possible to set up scaffolding from below using general scaffolding materials. ■ I want to safely remove scaffolding during the Shimbashi construction. ■ I want to eliminate traffic restrictions and road closures. *For more details, please download the PDF or feel free to contact us.
catalog(6)
Download All CatalogsCompany information
OSK Corporation has obtained a construction method patent and registered the "Slide Bazooka Method" with NETIS, enabling the safe and rapid installation of suspended scaffolding at sites where scaffolding installation was previously impossible. Please feel free to consult us regarding the application of this method on-site, estimates, or examples during the planning stage.