We would like to introduce a case where we provided peace of mind to hospitals where air conditioning shutdown poses a significant risk!
We would like to introduce a case study of the introduction of "AaaS" at Jutokukai Kamigahara Hospital. The reasons for adopting our service included the clarity of the "system to prevent failures" and the "structure for responding to failures," the existence of a system for preventive maintenance, and the speed and sincerity of responses when failures occur. By introducing high-efficiency equipment and improving air conditioning operations, we were able to reduce annual electricity consumption by 36.8% within two years of implementation. [Case Overview] - Target Facility: Hospital - Number of Beds: 124 - Building Structure: Reinforced Concrete (3 stories above ground, 1 basement level) - Total Floor Area: 5,936 m² - Air Conditioning System: 29 systems for commercial buildings *For more details, please download the PDF or feel free to contact us.
Inquire About This Product
basic information
Three Reasons for Deciding to Implement ■ Clear mechanisms for "preventing failures" and "responding to failures" ■ A system that captures signs of failure through remote monitoring, allowing for preventive maintenance ■ Speed and sincerity of response when failures occur *For more details, please download the PDF or feel free to contact us.
Price range
Delivery Time
Applications/Examples of results
For more details, please download the PDF or feel free to contact us.
catalog(1)
Download All CatalogsCompany information
Our company provides services that utilize air conditioning systems, water supply and drainage systems, electrical systems, and the system technologies and software that control them, to offer a suitable usage environment for these facilities, while achieving reductions in utility costs and environmental impact. Moving forward, we aim to be a service provider that closely aligns with our customers' needs by leveraging advanced air conditioning and IT technologies.