Lightweight and compact with a steel material and plated finish! Can be installed under various conditions.
The "Just-In Assembly Waterway System" is a system that enables a reduction in construction time and costs. Despite having a maximum water delivery capacity of 100 tons per minute, it is foldable and compact. The assembly method is simple and easy to handle, achieving cost reduction as well. Additionally, fish migrating in rivers can continue to ascend without being hindered during construction, allowing for water replacement work that does not impact the natural environment. 【Features】 ■ Easy to install and dismantle due to its assembly design ■ Lightweight and compact with appealing durability ■ Can be folded compactly for transportation ■ Generates minimal waste, reducing disposal costs ■ Functions as a "pollution prevention tank" and "fishway" *For more details, please download the PDF or feel free to contact us.
Inquire About This Product
basic information
For more details, please download the PDF or feel free to contact us.
Price range
Delivery Time
Applications/Examples of results
【Construction Examples (Partial)】 ■ Shoreline construction (installation in narrow locations) ■ Shoreline construction (full river diversion) ■ Improvement of buried drainage pipes (full river diversion) ■ Combination with prefabricated waterways ■ Disaster recovery construction (shoreline construction) *For more details, please download the PDF or feel free to contact us.
catalog(1)
Download All CatalogsCompany information
Creator Co., Ltd. is a company engaged in the technical research and development, design, manufacturing, and rental of products related to "water replacement" technology. With the concept of "Just-In," we enable the use of products as needed, when needed, and in the necessary quantities, achieving both cost reduction and consideration for the natural environment. Please feel free to contact us if you have any inquiries.