We will introduce consulting matters for the consideration of CCS implementation (Surface field).
The Facility Technology Department of our company will provide support regarding the planning and implementation of CCS (Carbon Dioxide Capture & Storage) in the following areas: <Surface Facilities/Equipment> - Confirmation and identification of CO2 emission sources (equipment and devices), estimation of emission amounts - Comparison of CO2 separation and recovery methods, estimation of approximate costs, and selection support - Comparison of CO2 transportation methods, estimation of approximate costs, and selection support - Comparison of CO2 storage, absorption, and fixation methods, estimation of approximate costs, selection support, comparison of specific regions and locations, examination of necessary measures, estimation of approximate costs, and selection support - Estimation of approximate costs for the construction of facilities and equipment for specific methods and locations of CO2 storage, absorption, and fixation, as well as estimation of operational costs - Comparison of monitoring methods and durations during and after the implementation of CO2 storage, absorption, and fixation, estimation of approximate costs, and selection support (some tasks may be outsourced to partner companies) - Comparison of closure, disposal, and waste methods for facilities and equipment related to CO2 storage, absorption, and fixation, examination of necessary measures, estimation of approximate costs, and advice on selection (excluding abandoned mine-related matters) - Examination of monitoring methods and durations after the closure of related facilities and equipment, cost estimation, and advice on selection. (Continued below)
Inquire About This Product
basic information
Preparation and proposal of the construction schedule for CCS-related facilities and equipment, as well as management support for design and construction. Verification of compliance with technical standards related to CCS and investigation of legal compliance. Conceptual design through the above items (including cost estimation and schedule preparation). Confirmation and verification related to the above items, second opinions, and evaluations. Lectures and training related to CCS-related facilities and equipment concerning the above items. (Note: Please be aware that compensation costs for accidents occurring during facility construction or equipment creation, as well as compensation cost estimation related to land use, are not included.) We can accommodate consultations on individual items as well as general inquiries, so please consider this. For detailed inquiries or any questions, please feel free to contact us. Contact information: Japan Oil Engineering Co., Ltd. 7th Floor, Building Z, Harumi Island Triton Square, 1-8-12 Harumi, Chuo-ku, Tokyo 104-6207 Tel: 03-5548-1661 HP Inquiry: https://www.joe.co.jp/contact/
Price range
Delivery Time
Applications/Examples of results
For more details, please feel free to contact us.
catalog(3)
Download All CatalogsCompany information
Our company aims to contribute to the international community as a good advisor with a broad perspective, in order to connect limited resources and invaluable nature to the next generation. With over 50 years of experience and the use of the latest technologies, we respond to customer needs in a wide range of fields related to energy and the environment, including oil and natural gas development and production, new energy development such as methane hydrate and geothermal energy, technology development for reducing environmental impact including carbon dioxide capture, storage, and utilization (CCS/CCUS), and HSE consulting.