[Construction Examples] Parts Factory: Gap and Void Filling Work, Vibration Suppression Work
Preventive measures for vibrations in factories equipped with high-precision devices! Filling the voids under the concrete floor in a short construction period.
We would like to introduce a case of "void filling work and vibration suppression work" carried out at a parts factory in Aichi Prefecture. The parts factory is equipped with high-performance machining equipment. Due to the ground conditions where the factory is built, a few millimeters of void filling was implemented as a preventive measure for vibration suppression. The construction area was approximately 279m², and the construction period was two days during the daytime. The work was carried out without moving any items within the factory after taking precautions before construction. 【Case Overview】 ■ Construction Area: Approximately 279m² ■ Area: Aichi Prefecture ■ Construction Period: Two days during the daytime *For more details, please refer to the PDF document or feel free to contact us.
Inquire About This Product
basic information
For more details, please refer to the PDF document or feel free to contact us.
Price range
Delivery Time
Applications/Examples of results
For more details, please refer to the PDF document or feel free to contact us.
catalog(7)
Download All Catalogs![Concrete pavement slab settlement correction method [Joint step difference and base slab settlement correction method]](https://image.www.ipros.com/public/catalog/image/01/2a4/608051/IPROS7464396502897123536.png?w=120&h=170)
Company information
We carry out construction to correct the sinking, tilting, steps, and gaps in concrete floors caused by uneven ground subsidence in buildings such as factories, warehouses, stores, and general residences, using our unique "Upcon Method" with completely non-fluorinated urethane resin and small machinery. Additionally, we are engaged in public works that utilize technologies developed through various research and development projects to restore the functionality of aging social infrastructure such as roads, airports, ports, and agricultural waterways. ■ Features of the Upcon Method 1. Short construction period: The construction time is 1/10 of conventional methods. 2. No interruption of operations: No need to move machinery or cargo. 3. Comprehensive high technical capability: 100% in-house employees. 4. Compact construction system: Quick restoration to the current state is possible. 5. Reduced risk of re-subsidence: Lower risk of re-subsidence compared to conventional methods. Our in-house staff provides total support from on-site surveys across the country to repair planning and construction, taking full responsibility. Our specialized and experienced in-house staff will propose the optimal repair plan tailored to your site. Upcon Co., Ltd. was newly listed on the Nagoya Stock Exchange Next Market on December 26, 2022.