A case where the manufacturing method was changed from cutting processing to forging processing, resulting in a 70% cost reduction in the customer's purchase unit price.
We would like to introduce a case where we proposed "reducing the manufacturing process and increasing production lots" to an industrial machinery manufacturer. The customer was purchasing low-head type special-shaped hexagon socket bolts M2 from an e-commerce site, but they had a request to reduce costs due to the high unit price and increasing usage. We proposed a change in the manufacturing method, which was adopted without any issues and met or exceeded the performance of the conventional products, resulting in significant cost reduction. [Case Overview] ■ Issues - Costs had become too high - The shape was not particularly difficult to manufacture, despite being outside JIS standards ■ Requirements for Solving the Issues - Reduction of costly machining processes - Establishing production lots that ensure stable lead times *For more details, please refer to the related links or feel free to contact us.
Inquire About This Product
basic information
【User Benefits】 ■ Achieved approximately 70% cost reduction (customer purchase unit price) ■ Significant reduction in lead time *For more details, please refer to the related links or feel free to contact us.
Price range
Delivery Time
Applications/Examples of results
For more details, please refer to the related links or feel free to contact us.
catalog(2)
Download All CatalogsCompany information
We are not just a simple fastener supplier; we approach our customers' problem-solving with a broad perspective on "fastening." Instead of relying on measures based on experience and habit, we propose the best solutions after understanding the root causes of the problems.