Dry landing for internal steel stairs. On-site concrete is not required.
▶Significantly reduce ancillary work The on-site labor required for stair installation is almost solely for the installation itself.
Inquire About This Product
basic information
◆Mortar-filled. No curing period is required. The pre-mortar type is filled with mortar at the factory in advance, eliminating the need for a curing period on-site. ◆A safe working passage can be secured. The surface of the landing is flat and easy to walk on, providing high performance as a temporary staircase. ◆Reduces walking noise. The two-layer plywood type has a high soundproofing effect and is quiet when walked on. The pre-mortar type can further enhance the soundproofing effect. ◆Finishing work is also easy. Since the surface of the landing is made of steel plates, it is easy to adjust the substrate for applying floor finishing materials, and adhesion can be done reliably.
Price range
Delivery Time
Applications/Examples of results
Please consult us regarding the internal steel stairs of buildings such as office buildings and commercial facilities.
Company information
Since its founding in 1951, Yokomori has continued on its unique path as a "stair company." The fact that our products are used in approximately 80% of Japan's high-rise buildings over 200 meters tall is a testament to the strong trust we have earned from everyone. Our response to requests regarding stairs is to meet them at a level beyond what is expected. This is the attitude we have consistently upheld as a "stair company" since our inception. *Based on our research (as of September 2023).