Geothermal Facility Implementation Case: Kanayama Seiki Manufacturing Co., Ltd. Shiga Factory
Introducing a case study of a company that continues to take on challenges in various business fields, which has been adopted by the Shiga factory!
Kanayama Seiki Manufacturing Co., Ltd. is a company that continues to challenge itself in various business fields based on precision metal processing technology for aircraft parts and more. Amidst the changing environment surrounding the domestic metal processing industry due to intensified competition with overseas manufacturers and rising electricity costs, the company is striving to improve productivity by proposing three themes for a new concept factory: (1) "24-hour constant temperature," (2) "energy saving," and (3) "clean environment." The "GEO Power System" has been adopted at the Shiga factory based on its successful implementation at the company's resort facilities. After the introduction, we received positive feedback from employees stating, "We are experiencing sufficient effects in line with our objectives." [Case Overview] ■ Completion: September 2014 Published in the GEO Power System newsletter "Wind of the Earth," Issue 297. *For more details, please refer to the PDF document or feel free to contact us.
Inquire About This Product
basic information
For more details, please refer to the PDF document or feel free to contact us.
Price range
Delivery Time
Applications/Examples of results
For more details, please refer to the PDF document or feel free to contact us.
catalog(2)
Download All CatalogsCompany information
Geo Power System Co., Ltd. aims to create spaces that promote "health" and "energy conservation" with its "GEO Power System," which utilizes geothermal energy.