[NETIS Registration] Resin Lightweight Formwork System 'PERI DUO'
PERI DUO (resin formwork)
It is a resin-based formwork system reinforced with fiberglass! <NETIS registration number: KT-230004-A>
Realization of weight reduction through the integration of end materials. Achieving an increase in the number of reuse cycles, this is an environmentally friendly lightweight formwork that is flexible on the construction site! 【DUO Product Features】 ■ New system formwork made of resin ■ High strength and lightweight ■ Fewer components, easy to handle ■ 100% recyclable <Simple Assembly Method> ・Anyone can easily install it ・No electric tools required ・Vertical and horizontal pipes are not necessary (depending on the construction situation) → Reduces labor costs! <Lightweight Resin Formwork> ・Easy to carry ・No processing work on site → High workability and shortened construction period! <Durable Resin Panels> ・Reuse cycles for face panels: 80 to 100 times (Replacement of face panels is possible.) ・Easy to clean → Reduces material costs and waste! <NETIS Registration Number: KT-230004-A> https://www.netis.mlit.go.jp/netis/
Inquire About This Product
Related Videos
basic information
【Main Material Sizes and Weights】 Panel DP 135 x 90 24.90 kg Panel DP 135 x 60 17.10 kg Panel DP 135 x 30 9.37 kg Panel DP 135 x 15 5.27 kg Multi panel DMP 135 x 75 22.90 kg Multi panel DMP 135 x 45 14.20 kg For Japan, the main panel is H1350 × W600 (17.1kg), with a lineup of W900, 750, 600, 450, 300, and 150. Additionally, we offer various sizes and types of panels, width adjustment panels, corner-specific panels, and accessories. *For more details, please refer to the PDF document or feel free to contact us.*
Price range
Delivery Time
Applications/Examples of results
【Feature 1】 Fewer components (approximately 30 fewer than conventional methods, such as steel pipes and supports) ↓ <Advantage> Less labor-intensive (e.g., a difference of 5 minutes per square meter = 50 minutes difference for 10 square meters) ↓ <Benefit> Contractors can extend their productivity accordingly 【Feature 2】 Can learn the assembly procedure in 2 to 3 hours ↓ <Advantage> Requires fewer skilled workers and technicians ↓ <Benefit> Contractors can have newcomers and trainees perform assembly and demolding Prime contractors also benefit from stable processes For specific implementation examples, please refer to the related videos on YouTube. At Perry Japan, we conduct product exhibitions of system formwork, study sessions, assembly experiences, and product seminars at our Ibaraki stockyard, based on the concept of "Listen, See, Touch/Ride, and Assemble" to meet customer requests. *We welcome inquiries regarding applications and case studies. You can also view projects using DUO abroad on our website.
Detailed information
-
(Performance Introduction) "New Construction of Iejima Paid Nursing Home" In the construction of the nursing home on Iejima Island, Okinawa, our lightweight resin formwork (DUO) and aluminum slab formwork (GRIDFLEX) were used.
-
RC 1-story building Construction area: 1,364 square meters Total floor area: 1,359 square meters Formwork construction area: Foundation part approximately 1,500 square meters, above ground floor: approximately 3,500 square meters (total: approximately 5,000 square meters)
-
The needs on-site were mainly identified as the following three points: reduction in the number of components, reduction in the number of workers, and a higher work efficiency. To address these issues, Perry Japan proposed the lightweight resin formwork system (DUO) and the aluminum slab formwork (GRIDFLEX), which were newly introduced to the Japanese market in 2019. These solutions contributed to the reduction of components, shortening of work time, and labor-saving.
-
Customer comment: "The number of formwork components per square meter has been halved, simplifying construction, improving work efficiency, and leading to a reduction in construction time. The amount of wood used has decreased compared to traditional methods, achieving resource conservation. The amount of materials transported to the site has decreased, reducing transportation costs. Additionally, since there is no need for steel compaction or nailing work like in traditional methods, noise has been reduced."
-
By using the lightweight resin formwork system (DUO) and aluminum slab formwork (GRIDFLEX), it is possible to reduce material transportation costs, decrease the number of workers, and achieve cost savings through labor-saving measures. For more details, please refer to the catalog or feel free to contact us.
catalog(3)
Download All CatalogsNews about this product(18)
Company information
Perry Japan Co., Ltd. was established in January 2006 as one of PERI's bases in over 60 countries worldwide. Our staff, including sales, technical, and construction instructors, are dedicated to providing various PERI products and services to our customers in Japan. We are actively working to address the numerous challenges our customers face, such as improving safety and quality during concrete placement at construction sites, reducing labor, shortening construction periods, and cutting costs, by providing systematic formwork and shoring solutions. *Please feel free to contact us regarding the applications, technical materials, construction methods, techniques, and examples of PERI products.