Reduction of 2 hours to about 20 minutes! A case where business efficiency was improved by the introduction of consistent palletization.
We would like to introduce a case study from Ito En, Ltd. at their Shizuoka Sagara Plant, where our pallets are being utilized. Before the introduction of our pallets, the company operated under the assumption that pallets would not be returned, and they were manually loading products onto trucks without using pallets, which took about two hours. After the introduction, they no longer had to worry about the return of pallets, and they could load products with a lift along with the pallets, reducing the time from two hours to about twenty minutes. 【Case Overview】 ■ Challenges - Loading products onto trucks manually without using pallets took about two hours. ■ Results - Time reduced from two hours to about twenty minutes. - No need for in-house pallet cleaning or quality control. *For more details, please refer to the PDF document or feel free to contact us.
Inquire About This Product
basic information
For more details, please refer to the PDF document or feel free to contact us.
Price range
Delivery Time
Applications/Examples of results
For more details, please refer to the PDF document or feel free to contact us.
catalog(1)
Download All CatalogsCompany information
Our company was established in 1972 with the aim of building a rental-style pallet pool system in Japan. Since then, we have completed a nationwide network and have contributed to the development of logistics.