Reinforcement of ground bearing capacity and improvement of permeability! Ground improvement with crushed stone is possible even in narrow spaces.
The "Eco-GEO Method" generates little vibration and noise, and does not produce harmful dust, allowing for construction that takes the surrounding living environment into consideration. With the "EG Casing," reliable excavation is possible, preventing wall collapse. Additionally, only minimal residual soil is generated on-site, so depending on the soil quality, zero waste disposal is possible. 【Features】 ■ Ground improvement with crushed stone is possible even in narrow spaces ■ Construction that considers the surrounding living environment ■ Prevention of wall collapse ■ Zero waste ■ No concerns about groundwater contamination *For more details, please refer to the PDF materials or feel free to contact us.
Inquire About This Product
basic information
【Construction Procedure】 ■Position Setting ■Excavation ■Excavation Completed ■Crushed Stone Compaction ■Completion *For more details, please refer to the PDF document or feel free to contact us.
Price range
Delivery Time
Applications/Examples of results
【Purpose】 ■Ground improvement using crushed stone *For more details, please refer to the PDF document or feel free to contact us.
catalog(1)
Download All CatalogsCompany information
IM Tokki Co., Ltd. conducts BH construction, TBH construction, pre-boring construction, and landslide prevention construction, among others. We handle commercial food waste processors (EcoBo, Magic Bio-kun, Aikuru, etc.), hygiene management systems (electrolyzed water hygiene management system) for hospitals and nursing care facilities, and electric bikes. Please feel free to contact us if you have any requests.