Constructing approach sections of road tunnels safely and reliably with pneumatic caissons!
The "Steel Temporary Wall Approach Caisson Method" is used when multiple caissons are installed in close proximity and connected using the pneumatic caisson method. After installation, the space between the caissons is retained using methods such as SMW, and excavation is performed as needed, including ground improvement. The steel temporary wall is then removed, and concrete for the bottom slab and side walls is poured and joined. Traditionally, temporary walls were constructed as reinforced concrete structures (RC temporary walls), but by using a steel sheet pile support structure (steel temporary wall), it is possible to shorten the process and reduce costs compared to conventional pneumatic methods. 【Features】 ■ Easy removal of temporary walls ■ Possible shortening of the process ■ Reduced impact on the environment ■ Reuse of support materials is possible ■ Excellent economic efficiency in total cost *For more details, please refer to the PDF materials or feel free to contact us.
Inquire About This Product
basic information
【Construction Flow】 (1) Construction work - Installation of steel temporary walls (2) Structural construction work - Installation of steel supports (3) Sunken excavation work (4) Completion of sunken excavation (5) Removal of intermediate buried concrete and caisson temporary facilities (6) Joint excavation work (7) Removal of joint side walls and structural concrete *For more details, please refer to the PDF document or feel free to contact us.
Price range
Delivery Time
Applications/Examples of results
For more details, please refer to the PDF document or feel free to contact us.
catalog(1)
Download All CatalogsCompany information
Our company mainly engages in contracting, design, supervision, and consulting for civil engineering and construction projects. In addition, we also undertake surveys, measurements, and design related to hydroelectric power generation, as well as design and construction using the compressed air caisson method, and we are involved in the design, manufacturing, repair, sale, and rental of construction machinery.