It is widely used for riverbanks, roads, sediment control, flood control, coastlines, and harbor structures.
We handle the "Large Stacking Block Type I, II," which complies with the cooperative standards for stacked concrete blocks. The installation work is carried out using heavy machinery, making it safe and easy to construct. Additionally, it has a stone-like pattern and has been certified with a brightness level of "6.0" or lower, making it an environmentally friendly block. 【Features】 ■ Type A (basic) is a knockout type that can be used for both water-wiping and stacking, allowing for construction with just two types. ■ End stops are provided with precast products. ■ There are foundation block products specifically for Type II. ■ Type II allows for horizontal installation in 5 minutes without using back formwork. ■ Type I has dedicated installation hardware, while Type II uses a 1-ton coupler. *For more details, please download the PDF or feel free to contact us.
Inquire About This Product
basic information
【Product Specifications】 ■Type I <A Type (Basic)> ・Main Dimensions: Height 998mm × Width 500mm × Length 350mm ・Reference Weight: 214kg ・Volume: 0.08m3/unit <B Type (End)> ・Main Dimensions: Height 499mm × Width 500mm × Length 350mm ・Reference Weight: 111kg ・Volume: 0.04m3/unit ■Type II <Standard> ・Main Dimensions: Height 998mm × Width 500mm × Length 350mm ・Reference Weight: 223kg ・Volume: 0.08m3/unit <Half Type> ・Main Dimensions: Height 494mm × Width 500mm × Length 350mm ・Reference Weight: 110kg ・Volume: 0.04m3/unit <Foundation Stone Standard> ・Main Dimensions: Height 998mm × Width 500mm × Length 350mm ・Reference Weight: 257kg <Foundation Stone Half Type> ・Main Dimensions: Height 494mm × Width 500mm × Length 350mm ・Reference Weight: 126kg *For more details, please download the PDF or feel free to contact us.
Price range
Delivery Time
Applications/Examples of results
【Case Studies】 ■Construction Year: H30 ・Client: Soma City ・Project Name: Improvement of Nishiyama Sanbusawa Line Road No. 2 ■Construction Year: H30 ・Client: Nihonmatsu Civil Engineering Office ・Project Name: Public Disaster Recovery Work (River) Ikagawa Line ■Construction Year: H30 ・Client: Minami Aizu Construction Office ・Project Name: Gamogawa Public Disaster Recovery Work *For more details, please download the PDF or feel free to contact us.
catalog(1)
Download All CatalogsCompany information
Our company has contributed to the local community through the manufacturing and supply of precast concrete products. We prioritize quality above all, striving for quality improvement and stable supply, and it is our mission to deliver our products to you as reliable products. Please feel free to contact us if you have any requests.