Completion of the installation of the concrete panel takes about a total of 2 hours! Introducing a case study of Styrofoam.
We have introduced "Styroprene JIS No. 3" at a certain RELIFE residence. Full precut with a thickness of 35mm, covering approximately 30 tsubo. The installation of the insulation material was completed in less than an hour after starting the work, and the total time for laying the plywood was about 2 hours. 【Overview】 ■ Client Name: Certain RELIFE Residence ■ Product Introduced: Styroprene JIS No. 3 ■ Application: Floor insulation material for detached houses ■ Details ・Full precut with a thickness of 35mm, covering approximately 30 tsubo ・The installation of the insulation material was completed in less than an hour after starting ・The total time for laying the plywood was about 2 hours *For more details, please refer to the related link page or feel free to contact us.
Inquire About This Product
basic information
【Features of Styroprene】 ■ Lightweight and easy to carry ■ Easy to process and simple to install ■ Thickness can be selected according to application ■ Insulation performance remains unchanged for semi-permanent duration ■ Resistant to water and moisture ■ Integrated system from proposal, estimation, production to delivery *For more details, please refer to the related link page or feel free to contact us.
Price range
Delivery Time
Applications/Examples of results
For more details, please refer to the related link page or feel free to contact us.
Company information
Dai-Nishi Kasei Co., Ltd. is a manufacturer of molded polystyrene products. We offer products tailored for various applications such as containers, packaging, protection, construction materials, and agricultural materials. Please feel free to consult us if you have any requests.