Introducing a solar power generation installation case with a panel output of 345.6 kW and a power conditioner output of 300.0 kW!
We would like to introduce a case study of our solar power roof leasing business. We installed a solar power system on the roof of Nagano Kounou Co., Ltd. Kawakuchikina Factory, located in Nagano City, Nagano Prefecture, with a panel output of 345.6 kW and a power conditioner output of 300.0 kW. Please feel free to contact us if you have any inquiries. 【Overview】 ■ Completion Date: December 2013 ■ Location: Nagano City, Nagano Prefecture ■ Power Output (Modules): 345.6 kW ■ Power Output (Power Conditioner): 300.0 kW *For more details, please refer to the PDF document or feel free to contact us. Sun Junior HP - https://www.sunjunior.co.jp/
Inquire About This Product
basic information
For more details, please refer to the PDF document or feel free to contact us.
Price range
Delivery Time
Applications/Examples of results
For more details, please refer to the PDF document or feel free to contact us.
catalog(1)
Download All CatalogsCompany information
Sun Junior Co., Ltd. was established in 1980, coinciding with the enactment of the national solar energy bill. Since then, we have aimed to be a leading group in the development of new product technologies, successfully completing the world-class solar system "Sun Junior," and evolving into a company that consistently handles development, manufacturing, sales, and after-sales service, the only one of its kind in Japan. We remain committed to our founding spirit of "wanting to protect our irreplaceable Earth," and we strive to be a company that future generations can be proud of, as we uphold trust and integrity. We sincerely thank everyone for their warm support thus far and kindly ask for your continued patronage in the future.