Easily assembled and disassembled pin joint method. Work close to walls is also possible. Compatible with various construction methods.
The "GV400 (E22WH-120C75)" is a pile driver mounted on a crawler crane that employs a pin joint method, allowing for quick assembly of the leader. The leader is mounted to rotate freely, making it easy to align with the pile center. Additionally, it enables pile driving work close to walls. The leader, which is suspended from the crane boom, can be installed freely without using catch forks, allowing for pile driving work on uneven surfaces and below stages. 【Features】 ■ Compatible with φ22mm wire ■ Hydraulic auger AG12000 ■ 75t base machine (Kobelco telescopic crawler TK750 Avalon specification) ■ Easy assembly and disassembly with a pin joint method ■ Easy alignment of pile center with upper rotation *For more details, please refer to the materials. Feel free to contact us with any inquiries.
Inquire About This Product
basic information
【GV400 Specifications】*Base Machine TK750 (Kobelco) ◎Leader Configuration (Maximum Leader Length) Upper Leader 3.5m + 5.0m + 5.0m + 5.0m + 5.0m + 3.0m + Reaction Plate (1.0m) = 27.5m ◎Auger Type AG12000 ◎Screw Diameter φ280~φ800 【Base Machine (TK750) Winch Specifications】 ◎Winch Main Winch / Auxiliary Winch / Third Winch ◎Applications Auger / Monken / Pile Driving ◎Lifting Force 68.6kN×4 / 68.6kN×1 / 51.9kN×1 ◎Rope Speed 120m/min / 120m/min / 100m/min ◎Wire Rope φ22×170m / φ22×75m / φ18×170m ◎Remarks With Free Fall ◎Vehicle Weight 64900kg *For more details, please refer to the materials. Feel free to contact us with any inquiries.
Price range
Delivery Time
Applications/Examples of results
*For more details, please refer to the materials. Feel free to contact us as well.*
catalog(1)
Download All CatalogsCompany information
Abolon System Co., Ltd. is committed to the theme of "achieving pollution-free" and strives to develop and improve products, providing original environmental construction machinery, including vibration-free and noise-free pile extraction machines. Ensuring thorough measures against vibration and noise is a social mission for companies handling various machinery involved in construction foundation work.