We will easily resolve manhole troubles.
The "Epo Method" is a technique that smoothly cuts out manholes that have started to make noise every time a vehicle passes over them using a hydraulic cutter, and finishes them with epoxy resin concrete material, making them three times stronger than asphalt. By mixing the paving aggregates, it ensures high strength and durability. Additionally, considering the residents' feelings that construction can be a nuisance, the height adjustment of the manhole can be completed in as little as 2 hours. 【Features】 ■ Improved durability ■ Reduced construction time ■ Low noise and low vibration *Available areas: Within Chiba Prefecture *For more details, please download the PDF or feel free to contact us.
Inquire About This Product
basic information
【Construction Time】 ■Hot Summer: 120 min ■Cold Winter: 180 min *Available areas: Within Chiba Prefecture *For more details, please download the PDF or feel free to contact us.
Price range
Delivery Time
Applications/Examples of results
【Construction Examples】 ■Manhole repair and iron cover replacement ■New manhole installation *Available areas: Chiba Prefecture *For more details, please download the PDF or feel free to contact us.
catalog(1)
Download All CatalogsCompany information
Kazama Construction Industry Co., Ltd. has always aimed to deliver quality work on time by leveraging the experience we have cultivated over many years for our clients who place orders with us. In addition to our track record and trust, we believe that our mission is to strive for the development of the local community, backed by our dedicated service. *Serviceable area: Chiba Prefecture