A construction method that simplifies quality control and improves work efficiency through work at floor level.
At Showa Rubber Engineering Co., Ltd., we offer the SGK jack-up method, which dramatically improves safety by reducing the amount of work at heights. Due to the installation primarily using mini cranes, the installation period can be significantly shortened. Additionally, ground assembly work greatly reduces the need for high-altitude tasks. 【Features】 ■ Shortened construction period due to reduced lifting time for piping materials and frameworks ■ Proactive safety measures through work procedure manuals ■ Simplified quality control and improved work efficiency by performing tasks at floor level ■ Enhanced cost-effectiveness by significantly reducing temporary scaffolding and aerial work platforms *For more details, please download the PDF or contact us.
Inquire About This Product
basic information
[Achievements] ■ 1995: Sanwa Bank Computer Center ■ 1996: Tokyo Opera City ■ 1998: Nikon Kumagaya Factory ■ 1998: New Central Government Building No. 2 ■ 1998: Saitama Wide Area Joint II Construction Zone *For more details, please download the PDF or contact us.*
Price range
Delivery Time
Applications/Examples of results
For more details, please download the PDF or contact us.
catalog(1)
Download All CatalogsCompany information
Showa Rubber Engineering Co., Ltd. started with the sale of vibration isolation devices for building equipment and various vibration-damping materials at the time of its establishment. As customer needs have changed, we have actively engaged in the fields of seismic devices, design, manufacturing, and installation of various steel structures, as well as the design and manufacturing of pump units. In the future, we will continue to build on the trust we have received from everyone so far, further honing our technical and sales capabilities to meet more advanced demands.