Achieved a cost reduction of 4.98 million yen per year! [Heat-insulating paint construction example]
Old Toshiba EMI Corporation Gotemba Factory [CoolSarm Construction Case Study]
At the Gotemba Factory of the former Toshiba EMI Corporation, the increase in air conditioning load due to the influence of outside temperatures and radiant heat during the summer was a significant challenge. Since it was not possible to create a space between the roof and ceiling, and the ceiling material was installed directly on the roof, the radiant heat from the roof greatly affected the indoor temperature, causing it to rise. The issue was resolved all at once with "Cool-Sarm" coating. [Case Study] ■ Roof area: 6,000 m² ■ Request: To stop the increase in air conditioning load *For more details, please refer to the catalog or feel free to contact us.
Inquire About This Product
basic information
【Effect】 ■ Achieved a roof surface temperature of '−20℃'! ・ Before painting: 54℃ ⇒ After painting: 34℃ ■ Achieved an attic ceiling board underside temperature of '−14℃'! ・ Before painting: 37℃ ⇒ After painting: 23℃ 【Investment recouped in approximately 3.5 years】 ■ Energy savings: 355.770 kWh / year ■ Monetary savings: 4.98 million yen / year ■ Investment amount (painting cost): 18 million yen ■ Payback period: 3.5 years ■ CO2 reduction amount: 134.5 t (electricity × 0.378: Tokyo Electric Power) *For more details, please refer to the catalog or feel free to contact us.
Price information
Please contact us.
Delivery Time
※Please contact us.
Applications/Examples of results
【Usage】 ■ As a heat-insulating and thermal insulation paint for roofs of factories, etc. *For more details, please contact us or download the catalog.
catalog(6)
Download All CatalogsCompany information
Since our establishment, we have been engaged in various maintenance businesses as the general agent in Japan for excellent building materials from around the world. While seeking outstanding products and expanding our information network globally, we aim to provide high-quality construction that utilizes the technologies and know-how we have cultivated over many years. It is our job to always stand in the customer's perspective and respond quickly and accurately to their various needs.