We are publishing the work procedures for the next-generation scaffolding with a height of 1,900 mm that creates a wide space.
The "Iq SYSTEM Work Procedure Manual" introduces the work procedures for the wedge-type scaffolding Iq system with a flange connection method. It covers "preparatory work and material delivery," including confirmation of the construction plan related to scaffolding, conducting safety meetings, and inspecting machinery and tools, as well as "important points regarding scaffolding inspections," such as monitoring the assembly of scaffolding and pre-work inspections. It also includes "assembly procedures," such as the placement of jack bases and the installation of support columns. [Work Procedures] ■ Preparatory work and material delivery ■ Important points regarding scaffolding inspections ■ Assembly standards ■ Assembly procedures ■ Dismantling procedures For more details, please contact us or download the catalog.
Inquire About This Product
basic information
【Contents】 ■Preparation Work and Material Delivery [Preparation Work] - Confirmation of construction plans related to scaffolding and verification of qualified personnel such as the work supervisor - Conducting safety meetings, inspecting machinery and tools, and checking protective gear - Confirmation of emergency equipment - Implementation of entry restrictions in the work area [Material Delivery] - Unloading, verification of materials, and minor transportation ■Important Points Regarding Scaffolding Inspection, etc. [Implementation of Inspections, etc.] - Monitoring of scaffolding assembly work and inspection after scaffolding assembly - Pre-work inspection [Inspection Implementation System] - Designation of inspectors, creation of inspection forms, and recording and preservation of inspection and repair results, etc. ■Temporary Construction Safety Management Inspection Checklist ■Assembly Standards ■Assembly Procedures - Assembly of the first layer, assembly of subsequent layers ■Dismantling Procedures - Removal of fall protection equipment (such as toe boards or mesh sheets) - Replacing and removing wall connections, etc. ●For more details, please contact us or download the catalog.
Price information
Please contact us.
Delivery Time
※Please contact us.
Applications/Examples of results
For more details, please contact us or download the catalog.
catalog(1)
Download All CatalogsCompany information
【Management Attitude】 ● We prioritize safety and security, providing services and manufacturing that exceed customer expectations. ● We remain mindful of the environment and grateful to society, supporting the creation of better lives for people. ● We respect personal growth and diversity, fostering an attractive environment where challenges can be enjoyed.