[Heat Stroke Prevention Case Study] Vehicle Maintenance Facility

This is an introduction to a case where a vehicle maintenance facility was implemented.
The work inside the vehicle maintenance facility was conducted without air conditioning, but due to the continuing extreme heat during the summer years, we were considering measures against heatstroke.
Therefore, we installed one unit of a spot bazooka integrated type in the vehicle maintenance lane, which is the work flow, and also installed two units of the spot bazooka integrated type on the opposite side.
We considered various products, but decided on Ease's spot bazooka after experiencing the actual machine at an exhibition. The deciding factor was that the large airflow allowed the air conditioning's cooling breeze to reach far away, and after installation, the dehumidified dry air reached us, drying our sweat and creating a comfortable environment.
For more details, please refer to the related products and catalog.
【Implementation Overview】
■ Delivery Location: Koto Ward, Tokyo, Vehicle Maintenance Facility
■ Number of Units Installed: 7 Spot Bazooka Integrated Types
■ Installation Period: July 2020


Inquiry about this news
Contact Us OnlineMore Details & Registration
Details & Registration