[Construction Case Collection] We have published the construction case collection No. 12 to No. 14 for Pro Seven seismic mats and fittings.

We have published a collection of case studies from Kawaminami Hospital in Miyazaki Prefecture (11)(12)(13). It includes case studies from warehouses and pharmacies, as well as from the biomass mat, featuring the following:
○ Equipment shelf (wall-mounted)
Hardware used: Belt stopper for shelves
○ Equipment shelf (center-mounted)
Hardware used: Belt stopper for shelves
○ Equipment shelf (center-mounted)
Hardware used: Belt stopper for shelves
○ Automatic splitting and packaging machine
Hardware used: PSD series
○ Powder medication dispensing counter
Hardware used: PSD series
○ Refrigerator for pharmaceuticals
Hardware used: Cabinet seismic hardware
○ Refrigerator
Hardware used: PSD series
○ Pharmaceutical storage shelf (large)
Hardware used: Belt stopper for shelves
○ Pharmaceutical storage shelf (medium)
Hardware used: Belt stopper for shelves
○ Pharmaceutical storage shelf (small)
Hardware used: Belt stopper for shelves
○ Pharmaceutical shelf (large)
Hardware used: Cabinet seismic hardware
○ Dispensing counter
Hardware used: PSD series
○ PC rack
Hardware used: Belt stopper for shelves


Inquiry about this news
Contact Us Online