A battery storage system has been installed alongside the mega-solar facility in Koga City, Fukuoka Prefecture, and power operations have begun.

Nippon Steel Engineering announced on July 3 that it has installed a new battery storage system at the "Aoyagi Solar Park I" in Koga City, Fukuoka Prefecture, and has begun operations for power management. This power plant is a mega-solar facility with an output of 2.6MW and has been in operation since 2018. In line with the transition to the FIP system, three large-scale storage batteries called "Mega Power," manufactured by PowerX, have been introduced to aim for stable supply of renewable energy.
The implemented AI control system "Think EMXS" efficiently coordinates solar power generation and battery storage, supporting demand-supply adjustments and optimal trading in the market. This allows for real-time management of power surplus and shortages, maximizing the utilization of renewable energy.
In the future, similar systems will be deployed in large-scale power plants with outputs of over 10MW, contributing to the spread of renewable energy and stable power supply.

Inquiry about this news
Contact Us OnlineMore Details & Registration
Details & Registration