[New Construction Case] Pond Dredging Work
We have uploaded a new construction case of the high water content soil improvement agent MT series, which efficiently transported high water content soil accumulated in a reservoir. Please take a look at the link below.
In this site, the accumulation of mud in the reservoir reduced the water storage capacity and became a problem. However, the original soil had a high water content ratio, making it difficult to transport using dump trucks.
Therefore, MT-2 was adopted, and after improving the soil with this product, it was initially transported within the site using a crawler dump truck, and then further transported to a temporary storage area several kilometers away using a dump truck.

Inquiry about this news
Contact Us Online






![[Update] The safety climber construction method brochure has been updated.](https://image.www.ipros.com/public/news/image/1/233479/IPROS3329911000359596783.jpg?w=280&h=280)