pump - Company Ranking(32 companies in total)
Last Updated: Aggregation Period:Oct 15, 2025〜Nov 11, 2025
This ranking is based on the number of page views on our site.
Display Company Information
| Company Name | Featured Products | ||
|---|---|---|---|
| Product Image, Product Name, Price Range | overview | Application/Performance example | |
| 【Other Features】 ■ Produced in bulk at the factory, ensuring high quality and easy on-site management ■ Use of continuous mixing pumps allow... | 【Applications】 ■ Shotcrete for small cross-section tunnels such as water conduits ■ Shotcrete behind TBM excavation ■ Shotcrete reinforcemen... | ||
| 【Construction Overview (Excerpt)】 <Construction Name: Furukawa Underground Retention Basin Water Intake Facility Construction> ■Purpose of t... | For more details, please refer to the PDF document or feel free to contact us. | ||
| 【Configuration of the Denka Subshot System (Main Equipment)】 ■ Lift tank for transporting "Denka PF Mortar" ■ PF mortar hopper and discharge... | 【Delivery Achievements (Excerpt)】 ■ Shimizu No. 3 Tunnel: Access Tunnel for Expressway ■ Shinyuyama Power Station: New Waterway Construction... | ||
|
---
--- |
--- | ||
-
- Featured Products
-
Special Fiber-Combined Premixed Mortar Denka PF Mortar TYPE-K
- overview
- 【Other Features】 ■ Produced in bulk at the factory, ensuring high quality and easy on-site management ■ Use of continuous mixing pumps allow...
- Application/Performance example
- 【Applications】 ■ Shotcrete for small cross-section tunnels such as water conduits ■ Shotcrete behind TBM excavation ■ Shotcrete reinforcemen...
[Presenting Construction Case Studies] TDR Shot Lightning System
- overview
- 【Construction Overview (Excerpt)】 <Construction Name: Furukawa Underground Retention Basin Water Intake Facility Construction> ■Purpose of t...
- Application/Performance example
- For more details, please refer to the PDF document or feel free to contact us.
TBM Spraying System Subshot System
- overview
- 【Configuration of the Denka Subshot System (Main Equipment)】 ■ Lift tank for transporting "Denka PF Mortar" ■ PF mortar hopper and discharge...
- Application/Performance example
- 【Delivery Achievements (Excerpt)】 ■ Shimizu No. 3 Tunnel: Access Tunnel for Expressway ■ Shinyuyama Power Station: New Waterway Construction...
-
Membership (free) is required to view all content.
Already a Member? Log In Here
エムシーエム 北陸センター