1~4 item / All 4 items
Displayed results
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationContact this company
Contact Us Online1~4 item / All 4 items
Are you aware that if there is a "specific ceiling" in an existing building, it becomes non-compliant and the application for an extension cannot be accepted? For those of you who understand this but are struggling because you cannot stop your business activities, we would like to introduce our construction achievements. * A "specific ceiling" refers to a suspended ceiling that is over 6 meters high, with an area exceeding 200 m² and a mass exceeding 2 kg/m², installed in places used by people on a daily basis. <Overview of the target building> Factory (metal steel plate manufacturing company) Construction area: 503 m² Working days: 22 days * Fully operational 24 hours a day with Sundays off. Approximately 10 days off only during the New Year and May holidays. The work was concentrated by dividing the construction area into two sections, utilizing the New Year holidays (section 1) and the May holidays (section 2). * ERI confirmation certificate received [Overview of the plan change] Treatment of the specific ceiling in the existing building. For more details, please download the PDF or contact us.
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationAre you aware that if there is a "specific ceiling" in an existing building, it becomes non-compliant and the application for an extension cannot be accepted? For those of you who understand this but are struggling because you cannot stop your business activities, we would like to introduce our construction achievements. * A "specific ceiling" refers to a suspended ceiling that is over 6 meters high, with an area exceeding 200 m² and a mass exceeding 2 kg/m², installed in areas used by people on a daily basis. <Overview of the Target Building> Store (used car sales, vehicle inspection and maintenance) Construction area: 230 m² Actual working days: 20 days * The store attracts many families, with a children's play area, and operates at full capacity except on Wednesdays. We set up a temporary stage during holidays and nighttime, while continuing regular operations below and conducting work simultaneously on the stage. * ERI confirmation certificate received 【Overview of the plan change】 Treatment of the specific ceiling in the existing building For more details, please download the PDF or contact us.
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationThis is an introduction to the relationship between "Obi-nuri-kun (ceiling collapse prevention)" and BCP (Business Continuity Planning) in the event of a major earthquake. If there are no ceiling collapse prevention measures in place, production activities will be halted due to ceiling collapse, and it will take time to resume operations. If ceiling collapse prevention measures are implemented, it can prevent the falling of ceiling components, allowing production activities to resume in a short period. We recommend taking earthquake measures early as a precaution. Please feel free to contact us if you need assistance. 【Overview】 <If there are no ceiling collapse prevention measures> ■ Production activities halted due to ceiling collapse ■ Time required to resume operations <If ceiling collapse prevention measures are implemented> ■ Prevention of falling ceiling components ■ Can resume in a short period *For more details, please refer to the PDF materials or feel free to contact us.
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registration"Obi-nuri-kun" is a method for preventing the collapse of ceilings in existing buildings. By applying a "fiber-reinforced coating (paint mixed with short fibers)" across adjacent ceiling panels, it bonds and integrates the components. By securing it with ceiling support wires installed on the ceiling surface, it prevents the ceiling components from falling during an earthquake. 【Features】 ■ Short construction period of 2 to 3 days ■ No unpleasant odors during construction; odorless and harmless ■ Cost reduction through a simple method ■ The coating strip is transparent paint, so it does not affect appearance ■ Construction can be carried out with only indoor protection, eliminating the need for moving ■ Obtained building technical performance certification (GBRC Performance No. 17-27) ■ Numerous construction achievements (many cases have obtained subsidies from the Ministry of Education, Culture, Sports, Science and Technology) *Achievement materials are available. For more details, please download the PDF or contact us.
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registration