1~2 item / All 2 items
Displayed results
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationContact this company
Contact Us Online1~2 item / All 2 items
The "Soil Particle Recovery Circulation System" is a turbidity treatment method used in construction that involves drilling with water, allowing for the circulation of muddy water without discharging it outside the site. Since the water returns to the excavation equipment in a state close to clean water, there is less wear on the equipment, and the system can be constructed very easily, making it suitable for various site conditions. Additionally, the maintenance costs are low, and no special skills are required for maintenance. 【Features】 ■ Construction can be carried out with minimal discharge of muddy water outside the site. ■ The system can be constructed very easily, making it adaptable to various site conditions. ■ Maintenance costs are low, and no special skills are required for maintenance. ■ The water returns to the excavation equipment in a state close to clean water, resulting in less wear on the equipment. *For more details, please refer to the PDF materials or feel free to contact us.
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationThe "Diagonal Platform Construction Method" is a technique that provides a working platform for drilling machinery when installing ground anchors on slopes. It consists of two types of working platforms: an "upper working platform" and a "base frame or temporary H-beam," which can freely change the slope and can be moved independently. Additionally, it reduces the time and costs associated with traditional scaffolding work, aiming to shorten the construction period. 【Features】 ■ Work processes can be shortened ■ Requires no specialized skills due to fewer components ■ Can be installed in any desired location *For more details, please download the PDF or contact us.
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registration