Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationContact this company
Contact Us Online1~1 item / All 1 items
The "Dry Method" is a construction technique that enables total maintenance, including repairs to splash zones, tidal zones, and upper concrete of marine steel structures such as steel sheet piles. By utilizing a dry box to create a state of dehumidification, it allows for more reliable and high-quality repairs to be carried out. 【Features】 ■ Accurate visual inspection of damage conditions, such as thickness reduction due to corrosion and holes caused by pitting. ■ Achieves safe, reliable, and rapid construction. ■ Improved reliability. ■ Simultaneous construction of reinforcement work, not limited to repair work. *For more details, please download the PDF or feel free to contact us.
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registration