1~2 item / All 2 items
Displayed results
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationContact this company
Contact Us Online1~2 item / All 2 items
The Waste Regulation Division of the Ibaraki Prefectural Department of Citizen Life and Environment faced challenges with the costs associated with surveying, which varied depending on the scale of the site, as well as the time it took to obtain survey results and the extensive time required for subsequent document preparation. To address this, we introduced the cloud-based field management DX tool "Kumiki." Previously, simple surveying tasks required the cooperation of many staff members, but now two people can handle it. We received feedback stating, "The alignment function is excellent, and it is very convenient to easily compare images taken at different times." [Challenges] ■ Costs vary depending on the scale of the site ■ It takes days to obtain survey results ■ Document preparation requires a significant amount of time *For more details, please refer to the PDF document or feel free to contact us.
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationWe would like to introduce a case study on the implementation of the cloud-based on-site management DX tool "Kumiki" at Mizukura Group, Inc. The company faced the challenge of requiring 2 to 3 days of work with 2 to 3 personnel when there were multiple embankments to measure. After the implementation, it took only a few dozen minutes for drone photography and about ten minutes for measurements using the drone surveying function of our product, all manageable by a single person. This allowed for a significant reduction in both work time and personnel. [Challenges] - Required 2 to 3 days of work with 2 to 3 personnel. - A system capable of utilizing point cloud data is necessary to adapt to future construction DX. *For more details, please refer to the PDF document or feel free to contact us.
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registration