Other construction industries
福田組 東京本社・本店

Contact this company
Contact Us Online
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationContact this company
Contact Us Online1~1 item / All 1 items
The "Dual Shield Method" is a shield switching type of thrust construction method that incorporates the advantages of both thrust and shield methods. It employs a cost-effective thrust method for gentle curves and straight sections, while using the shield method for sharp curves and continuous curve sections. This makes it easier to construct pipelines in densely populated urban areas, significantly reducing costs. 【Features】 ■ Capable of sharp curves (R10m) without the need for rotating shafts at intersections ■ Can be constructed with shafts sized for thrust methods ■ Equipment from thrust methods can be used ■ Average daily progress increases by combining thrust methods ■ Using a mud slurry method increases thrust extension *For more details, please download the PDF or feel free to contact us.
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registration