1~4 item / All 4 items
Displayed results
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationContact this company
Contact Us Online1~4 item / All 4 items
"e Pack" is a filling material for repairing concrete holes after formwork removal. By simply mixing the 1-minute pack, anyone can easily perform filling repairs. 【Application Capacity】 ■ Standard Type (C) = approximately 100cm3/bag ■ Vertical Hole Specific Type (P) = approximately 500cm3/bag *For more details, please refer to the PDF document or feel free to contact us.
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationThe "Hexagonal Smart Cone" is a formwork retaining cone that has a concrete opening area after removal that is approximately 1/7 of that of conventional plastic cones. The missing parts are smaller compared to conventional products, which improves the accuracy of the structure and enhances its design quality. Additionally, the formwork assembly remains the same as before, so there is no increase in the workload for carpenters. 【Features】 ■ The concrete opening area after removal is approximately 1/7 compared to conventional plastic cones. ■ The accuracy of the structure is improved, along with enhanced design quality. ■ Filling holes is done with a dedicated cap, reducing the workload for plastering. ■ There are no concerns about future mortar falling out. ■ Since it does not use plastic, there is no deformation or crushing. *For more details, please refer to the PDF document or feel free to contact us.
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registration1. There is no need for plastering contractors to backfill the P-con holes. 2. It is expected to shorten the overall construction period and reduce costs by omitting construction processes. 3. Formwork contractors do not need to bring P-cons to the site, which also eliminates the hassle of inventory management. 4. The workability is the same as conventional P-cons. *This product offers many benefits for contractors, formwork companies, and clients alike.* *For more details, please refer to the PDF materials or feel free to contact us.*
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registration1. There is no need for plastering contractors to backfill the P-con holes. 2. It is expected to shorten the overall construction period and reduce costs by omitting construction processes. 3. Formwork contractors do not need to bring P-cons to the site, which also eliminates the hassle of inventory management. 4. The workability is the same as conventional P-cons. *This product offers many benefits for contractors, formwork companies, and clients alike.* For more details, please contact us or download the PDF to view.
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registration