Construction Consultant
鹿間工業

Contact this company
Contact Us OnlineBefore making an inquiry
Download PDF
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationContact this company
Contact Us OnlineBefore making an inquiry
Download PDF1~1 item / All 1 items
At Rukama Industries, we are engaged in seismic reinforcement projects to protect buildings from earthquakes and ensure the safety of everyone who works and lives there. The damage to buildings seen in the 1995 Great Hanshin-Awaji Earthquake, the 2007 Niigata Chuetsu Offshore Earthquake, the 2008 Iwate-Miyagi Inland Earthquake, and the 2011 Great East Japan Earthquake can be attributed to the deterioration of the buildings themselves and the fact that they do not meet seismic standards. We promote seismic reinforcement work centered on steel frame reinforcement, aiming to create an environment where people can live and work with peace of mind. The first step in seismic reinforcement is the "seismic diagnosis." Our company offers preliminary diagnostics before conducting seismic reinforcement. Please feel free to consult with us. 【Flow of Seismic Reinforcement (from Seismic Diagnosis to Construction Start)】 (1) Preliminary Investigation (2) On-site Building Inspection (3) Implementation of Seismic Diagnosis (4) Preparation and Reporting of Diagnosis Report (5) Planning of Seismic Reinforcement Proposal (Calculation of Construction Period and Costs) (6) Administrative Procedures and Reinforcement Work (7) Completion Inspection (8) Handover *For more details, please feel free to contact us.
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registration