Other construction industries
伊藤工業

Contact this company
Contact Us Online
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationContact this company
Contact Us Online1~1 item / All 1 items
The "FB9 method" is a construction technique that mechanically expands and excavates the supporting ground at the tip of steel pipe piles, creating an enlarged foundation bulb using a cement milk jet mixing method. This method has been recognized as having equal or greater bearing capacity than the intermediate excavation piles specified in the road bridge guidelines. The soil and sand discharged during the intermediate excavation can be treated as construction-generated soil, preventing secondary pollution. Additionally, it is a low-pollution method with low noise and vibration levels. 【Features】 ■ Environmental conservation ■ Reliable anchoring to the enlarged foundation bulb at the pile tip ■ High excavation efficiency ■ Integrity between the steel pipe pile and the tip bulb ■ Fast continuous construction *For more details, please download the PDF or feel free to contact us.
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registration