Electrical equipment construction business
東京動力 本社

Contact this company
Contact Us OnlineBefore making an inquiry
Download PDF
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationContact this company
Contact Us OnlineBefore making an inquiry
Download PDF1~1 item / All 1 items
At Tokyo Power Corporation, we construct turbines, generators, boilers, and even auxiliary equipment, which are the main facilities of power plants. In the case of new installations, the construction period for a turbine generator and boiler system with a capacity of 1 million kW is approximately 1 to 3 years. Additionally, all machinery is from top manufacturers, and we collaborate with their engineers to carry out assembly, installation, and trial operation on-site. We have acquired specialized and extensive skills to install and maintain not only electrical equipment but also all types of facility equipment. 【Business Items】 ■ Design and installation work for various power plant equipment and facilities ■ Design and installation work for various machinery and ancillary equipment ■ Design and construction of various piping ■ Worker dispatch services ■ All operations incidental to the above *For more details, please download the PDF or feel free to contact us.
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registration