Construction Consultant
大阪防水建設社

Contact this company
Contact Us Online
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationContact this company
Contact Us Online1~1 item / All 1 items
The "Freedom Move Method" is a construction technique that enables the injection of chemical solutions and remediation of contaminated soil directly beneath structures, which was difficult to achieve with conventional methods, through controlled boring using a high-precision measurement system. By employing specialized bits, it can also accommodate hard ground and gravel-mixed ground, eliminating the need for vertical pile equipment required for horizontal construction, thereby reducing costs and shortening construction time. Additionally, the use of a small drilling machine allows for construction in narrow spaces, such as those constrained by pipe racks. 【Features】 ■ Capable of controlled boring ■ No need for vertical pile equipment required for horizontal construction ■ Cost reduction and construction time shortening are possible *For more details, please refer to the catalog or feel free to contact us.
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registration