iPROS Urban Planning
  • Search for products by classification category

    • Building Materials
      Building Materials
      35428items
    • Facilities
      Facilities
      55950items
    • Lighting and Interior
      Lighting and Interior
      17175items
    • Common materials
      Common materials
      36602items
    • Civil Engineering Materials
      Civil Engineering Materials
      9519items
    • Construction, work and methods
      Construction, work and methods
      27271items
    • Surveys, Measurements, and Services
      Surveys, Measurements, and Services
      29212items
    • IT/Software
      IT/Software
      32210items
    • others
      others
      76457items
    • Store and facility supplies
      Store and facility supplies
      4334items
    • Office and commercial supplies
      Office and commercial supplies
      11356items
    • Hospital and welfare facility supplies
      Hospital and welfare facility supplies
      949items
    • Logistics Equipment
      Logistics Equipment
      6747items
    • Energy and Resources
      Energy and Resources
      11528items
  • Search for companies by industry

    • Information and Communications
      7213
    • others
      7010
    • Building materials, supplies and fixtures manufacturers
      6670
    • Service Industry
      4634
    • Trading company/Wholesale
      2997
    • Other construction industries
      2453
    • Electrical equipment construction business
      642
    • Interior Design
      527
    • Facility Design Office
      489
    • Construction Consultant
      464
    • Architectural design office
      361
    • retail
      344
    • Warehousing and transport related industries
      322
    • Electricity, Gas and Water Industry
      290
    • General contractors and subcontractors
      286
    • Interior construction business
      275
    • Medical and Welfare
      274
    • Educational and Research Institutions
      257
    • Building Management
      252
    • Renovation and home construction industry
      224
    • Water supply and drainage construction business
      203
    • Housing manufacturers and construction companies
      186
    • Transportation
      161
    • Real Estate Developers
      155
    • Fisheries, Agriculture and Forestry
      125
    • Structural Design Office
      66
    • Finance, securities and insurance
      36
    • Restaurants and accommodations
      29
    • self-employed
      29
    • Mining
      26
    • Public interest/special/independent administrative agency
      18
    • Police, Fire Department, Self-Defense Forces
      18
    • Store and building owners
      9
    • Property Owner
      8
    • Government
      8
    • Individual
      8
  • Special Features
  • Ranking

    • Overall Products Ranking
    • Overall Company Ranking
Search for Products
  • Search for products by classification category

  • Building Materials
  • Facilities
  • Lighting and Interior
  • Common materials
  • Civil Engineering Materials
  • Construction, work and methods
  • Surveys, Measurements, and Services
  • IT/Software
  • others
  • Store and facility supplies
  • Office and commercial supplies
  • Hospital and welfare facility supplies
  • Logistics Equipment
  • Energy and Resources
Search for Companies
  • Search for companies by industry

  • Information and Communications
  • others
  • Building materials, supplies and fixtures manufacturers
  • Service Industry
  • Trading company/Wholesale
  • Other construction industries
  • Electrical equipment construction business
  • Interior Design
  • Facility Design Office
  • Construction Consultant
  • Architectural design office
  • retail
  • Warehousing and transport related industries
  • Electricity, Gas and Water Industry
  • General contractors and subcontractors
  • Interior construction business
  • Medical and Welfare
  • Educational and Research Institutions
  • Building Management
  • Renovation and home construction industry
  • Water supply and drainage construction business
  • Housing manufacturers and construction companies
  • Transportation
  • Real Estate Developers
  • Fisheries, Agriculture and Forestry
  • Structural Design Office
  • Finance, securities and insurance
  • Restaurants and accommodations
  • self-employed
  • Mining
  • Public interest/special/independent administrative agency
  • Police, Fire Department, Self-Defense Forces
  • Store and building owners
  • Property Owner
  • Government
  • Individual
Special Features
Ranking
  • Overall Products Ranking
  • Overall Company Ranking
  • privacy policy
  • terms of service
  • About Us
  • Careers
  • Advertising
  1. Home
  2. General contractors and subcontractors
  3. 丸八土建
  4. Product/Service List
General contractors and subcontractors
  • Added to bookmarks

    Bookmarks list

    Bookmark has been removed

    Bookmarks list

    You can't add any more bookmarks

    By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

    Free membership registration

丸八土建

EstablishmentJune 1, 1961
capital6900Ten thousand
number of employees20
addressMie/Odai-cho, Taki-gun/Jiangma 668-1
phone0598-76-0100
  • Special site
  • Official site
last updated:Mar 27, 2021
丸八土建logo
  • Contact this company

    Contact Us Online
  • Company information
  • Products/Services(16)
  • catalog(14)
  • news(0)

丸八土建 List of Products and Services

  • category

1~16 item / All 16 items

Displayed results

Filter by category

Slope greening method Slope greening method
Weed control method Weed control method
Methods for improving the efficiency of solar power generation. Methods for improving the efficiency of solar power generation.
List of slope construction methods List of slope construction methods
class="retina-image"

Erosion Prevention Method: "Soil Coat Spraying Method"

After construction, it shows effects in as little as one day. It can be applied with simple machinery. Measures to prevent erosion of earth and sand slopes.

The "Soil Coat Spraying Method" is a technique that uses a mixed material consisting of the acrylic resin "PoliSoil α" combined with wood-based fibers to strongly coat soil slopes. It demonstrates effectiveness within 1 to 3 days after application, and the effects can last for about six months to one year. This method contributes to preventing erosion and soil runoff during construction, such as large-scale slope excavations. Since it can be applied using simple machinery, it is a method that can be easily adopted by contractors engaged in civil engineering work. 【Features of the Soil Coat Spraying Method】 ■ Achieves rapid effectiveness in erosion prevention and long-term durability ■ Prevents soil runoff even during heavy rains of several tens of millimeters ■ High cost-effectiveness and excellent economic efficiency ■ Compatible with various soil types ■ Since it becomes less prone to erosion, it allows for substantial slope reinforcement work to be carried out after the entire project is completed *For more details, please refer to the PDF materials or feel free to contact us.

  • Special Construction Method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Polysoil Soil Improvement Method for Slope Greening in Rock Bed Greening

Highly effective for greening rock surfaces! When naturally dried, it exhibits erosion prevention effects and forms a robust greening foundation that is not washed away even by heavy rainfall of several tens of millimeters per hour.

The "PoliSoil Soil Improvement Method" is an effective slope greening technique that offers rapid erosion prevention, reliable full greening, and high cost-effectiveness, even for rock and hard soil. By adding acrylic polymer resin to the soil material, a solid foundation is achieved. It protects the surface by spraying it onto rock slopes or soil slopes. Since fertile black soil is solidified with acrylic resin and soil granulation agents, it is not washed away by rain. 【Features】 - Soil material: High-nutrition foundation of black soil, bark compost, and wood-based fibers - Rapid effectiveness that demonstrates erosion prevention within 1 to 3 days of natural drying after construction - Forms a robust greening foundation that combines erosion prevention and permeability - Protects slopes with a coating effect that does not wash away even in heavy rain with rainfall rates of several tens of millimeters - Its effects last approximately six months to one year, ensuring reliable greening regardless of the construction period ★ For soil slopes, we recommend the cost-effective "PoliSoil Greening Method." We also provide a catalog along with the "PoliSoil Soil Improvement Method," so please refer to the PDF materials for more details or feel free to contact us.

  • Special Construction Method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

White Coat Spraying Work - Construction Case Studies

It is also effective in preventing erosion during rainfall! The reflected light increases the power generation of the double-sided solar panels.

This document is a collection of case studies on the "White Coat Spraying Method," which enhances the power generation efficiency of dual-sided solar panels. It includes a complete list of materials used at the "Anjō City Solar Power Plant" in Gunma Prefecture and the "Hitachi Ōmiya City Solar Power Plant" in Ibaraki Prefecture, as well as photos of the machinery used and the spraying conditions. The application of the pure white coating not only increases the amount of reflected light for solar power generation but also provides long-lasting erosion prevention and weed suppression effects due to its strong foundation. Please refer to the PDF download below for more information. [Featured Cases] ■ Anjō City Solar Power Plant, Gunma Prefecture ■ Hitachi Ōmiya City Solar Power Plant, Ibaraki Prefecture *For more details, please refer to the PDF document or feel free to contact us.

  • Solar mounting brackets and fittings (solar fittings and protective sheets)

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Introduction of the featured article "PoliSoil Greening Technology"

Slope protection work aimed at preventing soil erosion through soil particle aggregation and slope coating effects.

"PoliSoil Greening Works" has been featured in "Solar Journal," "Construction Price," and "Nikkei Construction." The publication includes numerous examples such as cases of spray application on sloped sandy soil, construction achievements from emergency works for landslides in Kiho Town, Mie Prefecture, and applications of Okinawa's red soil runoff countermeasures technology in slope greening. Please take a moment to read it. [Contents of the Publication] ■ Scenes of spray application ■ Construction achievements of PoliSoil Greening Works ・Emergency works for landslides in Kiho Town, Mie Prefecture ・Winter construction in Sugadaira, Ueda City, Nagano Prefecture ■ Introduction to PoliSoil Greening Works *For more details, please refer to the PDF document or feel free to contact us.

  • Civil Engineering Method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Introduction of slope greening examples at solar power plants [Case study collection available].

The slope with a geology of comprehensive mountain sand was improved through polysoil greening work, as soil was flowing out every time it rained. *Case study collection and technical materials are currently available.

We would like to introduce a case where our Polysoil Greening Work was implemented at a solar power plant. "Polysoil Greening Work" is a slope greening method that firmly coats soil and sand slopes with an acrylic resin, providing quick erosion prevention, reliable full greening, and significant cost-effectiveness. *NETIS Registration: KT-210082-A 【Challenges Before Construction】 Due to the geology of the entire area being sandy soil, soil would wash away with every rain, resulting in muddy water. 【Results After Construction】 - There was no runoff at all even during heavy rain on the third day after construction. - Full greening was achieved in about one month. *For more details, please refer to the materials available for download in PDF format or feel free to contact us.

  • Civil Engineering Method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Soil Coating Method "PoliSoil Greening" <NETIS Registered>

This is a new method of slope greening that combines rapid effectiveness in erosion prevention, reliability in full greening, and high cost-effectiveness. *Case studies and technical materials are currently available.

"PoliSoil Greening Work" is a slope greening method that firmly coats soil and rock surfaces with an acrylic resin, providing quick erosion prevention, reliable full greening, and high cost-effectiveness. *NETIS Registration: KT-210082-A By spraying PoliSoil Greening Work onto soil and rock surfaces, it not only provides a strong coating but also penetrates between soil particles to aggregate them. It demonstrates significant effectiveness in preventing rainwater erosion, seed loss, and windblown sand, regardless of flat or sloped surfaces. The effective lifespan of the method varies depending on natural conditions and soil types, but it is effective for approximately 6 months to 1 year, allowing for reliable greening even during unsuitable planting periods. 【Features of PoliSoil Greening Work】 ■ Contains soil aggregation agent "Polyvinyl Alcohol" ■ Solidifies soil within 2 to 3 days, preventing runoff even during heavy rainfall of several tens of millimeters ■ Permeable and breathable, providing adequate moisture to the soil ■ Neutral pH allows use in both acidic and alkaline soils ■ Water-soluble and free from harmful substances and heavy metals, ensuring high safety in the method *For more details, please view the materials from [Catalog Download] or feel free to contact us.

  • Civil Engineering Method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Prevent secondary disasters after landslides! Early slope greening method "PoliSoil Greening System."

Significant effects on "erosion prevention" and "turbid water generation prevention" during the recovery work period after landslides! Early greening measures for landslide sites.

"PoliSoil Greening Works" is a slope greening method that firmly coats earth and sand slopes with an acrylic resin, providing rapid erosion prevention, guaranteed full greening, and high cost-effectiveness. *NETIS Registration: KT-210082-A As an early greening countermeasure after landslide disasters, it is effective in preventing erosion and muddy water generation during the restoration work period. << Examples of Adoption at Landslide Disaster Sites >> ■ Order: Mie Prefecture, October 2020 ■ Target: Emergency work at a hillside collapse site due to Typhoon No. 14 This method has a rapid erosion prevention effect, and by spraying it onto the soil, it dries and solidifies naturally within 1 to 3 days, making it resistant to being washed away even in heavy rain with hourly rainfall of several tens of millimeters. Moreover, the effective duration of its effect varies depending on natural conditions and soil types, but it is generally effective for about 6 months to 1 year, allowing for reliable greening even during unsuitable periods for vegetation work. 【Method Features】 Rapid erosion prevention / Guaranteed full greening / High cost-effectiveness *For more details, please refer to the PDF materials or feel free to contact us.

  • Civil Engineering Method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Surface erosion prevention technology for slopes and embankments "BSC Method" *NETIS registered

Construction is also possible in areas with snow accumulation! Environmentally friendly surface erosion prevention technology utilizing soil algae.

The "BSC method" focuses on the fact that soil algae and other organisms that form BSC at the beginning of natural vegetation succession have an erosion prevention effect. It is an environmentally considerate technology that aims to establish BSC with native algae earlier to initiate vegetation succession. The presence of surrounding plants promotes the formation of natural vegetation according to soil conditions and climate. It avoids environmental impacts on native species, eliminates issues of genetic disruption for clonal propagation, and is easier to implement in areas with environmental conservation regulations. 【Features】 ■ Prevents the expansion of rill erosion (gullies) ■ The invasion of vegetation is influenced by surrounding environments, vegetation, and weather conditions ■ Construction is also possible in areas with snowfall *For more details, please refer to the related link page or feel free to contact us.

  • Paving Materials

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

"Landscape maintenance × weed prevention × water retention" Natural soil-based paving material 'Eco Clean Soil'

Contributing to greening! A natural soil-based paving material that maintains the natural landscape while effectively preventing weeds and retaining moisture.

"Eco Clean Soil" is a natural soil-based paving material that preserves the natural landscape. The moisture retained by its water retention properties provides a cooling effect on the surface when it evaporates, and its permeability allows rainwater and other moisture to be supplied to the planted trees. Additionally, since its main component is natural soil and it does not contain harmful substances, it can be crushed and returned to the soil after use. The installation is simple, requiring only the preparation of the base, spreading the product, and watering. 【Features】 ■ Excellent landscape ■ Mitigation of global warming ■ Contribution to greening ■ Returnable to soil ■ Easy installation *For more details, please refer to the related link page or feel free to contact us.

  • Paving Materials

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Technical Data: Polysol Greening Method <NETIS Registered>

Our true customers are the sea, mountains, rivers, and nature of Japan! A detailed introduction to Polisoil greening technology.

This document is the technical material for "PoliSoil Greening Works." *NETIS Registration: KT-210082-A PoliSoil achieves customer satisfaction (natural conservation) for clients (Japan's seas, mountains, and rivers) by preventing soil erosion. We introduce the "Overview of PoliSoil Greening Works," as well as "Soil Erosion Prevention Measures," "Construction Methods," "Mixing Plans," and more. [Contents] ■ Overview of PoliSoil Greening Works ■ Soil Erosion Prevention Measures ■ PoliSoil ■ Construction Methods ■ Mixing Plans ■ Construction Work Standards *For more details, please refer to the PDF document or feel free to contact us.

  • Civil Engineering Method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Data] Polisoil Greening Method Construction Achievement Collection <NETIS Registered>

We will introduce various construction achievements such as "solar power plants" and "disaster recovery projects"!

This document is a collection of construction achievements by Polisoil Green Infrastructure. *NETIS Registration: KT-210082-A It includes cases where soil was washed away and muddy water was generated every time it rained at the "solar power plant," as well as cases of severe gully erosion and sediment runoff. Additionally, we also introduce the construction work for "disaster recovery." 【Published Achievements】 ■ Matsusaka City Solar Power Plant ■ Ise City Solar Power Plant ■ Meiwa Town Solar Power Plant ■ Meiwa Town Road Disaster Recovery Work ■ National Route 422 Disaster Recovery Work No. 1 *For more details, please refer to the PDF document or feel free to contact us.

  • Civil Engineering Method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Catalog] Polysoil Greening Method <NETIS Registered>

More economically, reliably, and quickly effective! We will introduce the features and specifications of Polysoil.

This catalog introduces "PoliSoil Greening Works." *NETIS Registration: KT-210082-A It includes an overview of PoliSoil, reference prices, features, physical properties, and specifications. PoliSoil Greening Works demonstrate effectiveness in a more economical, reliable, and faster manner. It is suitable for various greening projects such as road embankments, riverbanks, and hillside slopes for soil conservation. [Contents] ■ What is PoliSoil… ■ New technology for preventing red soil runoff: PoliSoil ■ PoliSoil construction method ■ Reference prices ■ Features of PoliSoil ■ Physical properties and specifications of PoliSoil *For more details, please refer to the PDF document or feel free to contact us.

  • Civil Engineering Method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[NETIS Registration] Numerous examples of public works utilization! Polysoil greening method

Three effects of shortening construction time, improving landscape, and ensuring safety with one method! We will clearly introduce the situation before and several months after construction with photo documentation.

This document introduces various public works applications of the Polysoil greening method, which was implemented as a new construction method for vegetation engineering. *NETIS Registration: KT-210082-A It includes photos showing the condition from the completion of construction to two months afterward, as well as the construction status. There are numerous achievements as public works, so please feel free to contact us if you have any concerns. 【Examples of Cases Featured】 ■ Nezu Mido District Section 2 Land Readjustment Project (Before construction - 2 months after construction) ■ Emergency Conservation Project for Water Source No. 1-2 (Before commencement - 11 months after construction) ■ H29 Natural Disaster Prevention Project No. Matsui-6-2 (Before commencement - 5 months after construction) ■ H30 Preventive Mountain Management Project No. 1 (Before commencement - 5 months after construction) ■ Meiwa Town Road Disaster Recovery Project (Before commencement - 1 year and 3 months after construction) *For more details, please refer to the PDF document or feel free to contact us.

  • Civil Engineering Method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Information] Examples of Public Works Utilizing Polysoil Greening Method <NETIS Registration>

We will reveal the state of the project several months after construction, starting from before the construction! We will introduce various examples of public works utilization.

This document introduces various public works utilization examples of the Polysoil greening method, which was implemented as a new construction method for vegetation work. *NETIS Registration: KT-210082-A Photos showing the condition from the completion of construction to two months afterward, as well as the construction status, are included. Please use this as a reference for Polysoil greening work. 【Published Examples】 ■ Nezu Mido District Section 2 Land Readjustment Project (Before construction - 2 months after construction) ■ Water Source Preservation Emergency Improvement Project No. 1-2 (Before commencement - 11 months after construction) ■ H29 Natural Disaster Prevention Project No. Matsub-6-2 (Before commencement - 5 months after construction) ■ H30 Preventive Mountain Management Project No. 1 (Before commencement - 5 months after construction) ■ Meiwa Town Road Disaster Recovery Project (Before commencement - 1 year and 3 months after construction) *For more details, please refer to the PDF document or feel free to contact us.

  • Civil Engineering Method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Information] Overview and Case Studies of the Polysoil Greening Method <NETIS Registration>

Greening solar power generation facilities! We introduce an overview and various utilization examples.

This document introduces an overview of the Polysoil Greening Work implemented as a soil erosion prevention measure for solar power generation facilities, along with various case studies of its application. *NETIS Registration: KT-210082-A Starting with the "Overview of Polysoil Greening Work," it includes photos showcasing the greening of solar power generation facilities. Please use this as a reference for Polysoil Greening Work. 【Contents (Excerpt)】 ■ Company Overview ■ Greening Solar Power Generation Facilities! (Effects of Polysoil Greening Work) ■ Previous Vegetation Works ■ New Vegetation Works ■ Overview of Polysoil Greening Work *For more details, please refer to the PDF document or feel free to contact us.

  • Civil Engineering Method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Maruhachi Doken Co., Ltd. Slope Construction Method

We contribute to natural regeneration and environmental improvement through slope construction work.

The special slope construction method "TG Greening Method" achieves a high level of slope afforestation by recreating the granular structure of natural topsoil and the rooting effect of plant-based continuous fibers. The "SD Method" is a no-scaffolding rock bolt method that can accommodate various sites with special conditions. The "Porous Concrete Spraying Method" forms a permeable porous concrete, allowing drainage at all cross-sections. The "No-Scaffolding Anchor Method" enables high-altitude construction using a wire movement system without scaffolding. 【Product Lineup】 ○ TG Greening Method ○ SD Method ○ Porous Concrete Spraying Method ○ No-Scaffolding Anchor Method For more details, please contact us or download the catalog.

  • Special Construction Method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration
Prev 1 Next
  • イプロスがリアル展示会を主催します! AI/DX 営業・マーケティング展 出展社募集中 リード数・商談数が止まらない!新しいリアル展示会を提供 会期 2026年3月24日(火)~25日(水) 会場 東京ビッグサイト東4ホール 出展概要資料を進呈!
    • Contact this company

      Contact Us Online

    Products

    • Search for Products

    Company

    • Search for Companies

    Special Features

    • Special Features

    Ranking

    • Overall Products Ranking
    • Overall Company Ranking

    support

    • site map
    IPROS
    • privacy policy Regarding external transmission of information
    • terms of service
    • About Us
    • Careers
    • Advertising
    COPYRIGHT © 2001-2025 IPROS CORPORATION ALL RIGHTS RESERVED.
    Please note that the English text on this page is automatically translated and may contain inaccuracies.