1~11 item / All 11 items
Displayed results
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationContact this company
Contact Us Online1~11 item / All 11 items
This is the installation instruction material for "Saru Tobi Tasuke Type I," as well as "Saru Tobi Tasuke Type II (Frame Scaffolding)" and "Saru Tobi Tasuke Type II (Wedge-type Scaffolding)." It includes installation procedures and standard specifications for each type. Please feel free to use this for product selection. 【Lineup】 ■ Saru Tobi Tasuke Type I ■ Saru Tobi Tasuke Type II (Frame Scaffolding) ■ Saru Tobi Tasuke Type II (Wedge-type Scaffolding) *For more details, please refer to the PDF material or feel free to contact us.
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationIn traditional scaffolding work, workers would stand on each level and hand up scaffolding materials one by one, lifting them higher and higher. By using the scaffolding lift "Sarutobi Tasuke," materials weighing up to 120 kilograms can be lifted. With a standard 900mm torii-shaped frame, it can lift up to 8 pieces at once. The lift is designed in a rectangular basket shape to ensure stable stacking of scaffolding materials to prevent collapse. It also includes safety devices to address issues such as lift drops, allowing for safe use. 【Features】 ■ Lifting and unloading operations can be performed with a minimal number of personnel ■ Easy personnel deployment to the site *For more details, please refer to the PDF document or feel free to contact us.
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationThe "Sarutobi Tasuke" is a lift designed for scaffolding work, available in Type I for wedge-type scaffolding and Type II for framed scaffolding. The basket is large enough to accommodate 1200mm framed scaffolding materials without any modifications. You can choose a lift that matches the type of scaffolding material. Additionally, the guide rails are supported by a special device, ensuring smooth and stable movement. The chain block provides high durability, ensuring safety and peace of mind. 【Features】 ■ Large basket ■ Smooth loading and unloading with two guide rails ■ Safety features to prevent basket drops ■ Loading and unloading from two directions ■ Long posts can be easily removed, improving work efficiency *For more details, please refer to the PDF document or feel free to contact us.
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationA comparison of cost reduction when using the scaffolding work lift "Sarutobi Tasuke Type I" and the actual labor numbers calculated when using this product. As a result, by using this product, we achieved a reduction in labor costs and an increase in construction speed, with an average labor cost reduction of approximately 27%. Additionally, safety has improved due to a reduction in the risk of falling accidents. [Case Studies] ■ U Mansion (Fukuoka City): 23.2% labor cost reduction ■ O Building (Fukuoka City): 32% labor cost reduction ■ S Mansion (Fukuoka City): 19.4% labor cost reduction *For more details, please refer to the PDF document or feel free to contact us.
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationIn the construction industry, the term "Hiyari-Hatto" is often mentioned. It refers to moments that cause a sudden scare or realization, even if they do not lead to serious accidents. In scaffold work, there are many potential "Hiyari-Hatto" situations. By using the scaffold work lift "Sarutobi Tasuke," it is possible to operate with the minimum necessary number of people tailored to each site. This reduces the occurrences of "Hiyari-Hatto" and helps prevent unexpected falls of workers and materials. 【Features】 - Prevents unexpected falls of workers and material drops - Allows loading and unloading without leaning out from the scaffold - Minimizes invasion of residents' privacy in large-scale renovation apartments - Equipped with a fall prevention device as standard for emergencies - Conducts in-house testing to ensure safety *For more details, please refer to the PDF materials or feel free to contact us.
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationWe would like to introduce the achievements of the scaffold lift "Sarutobi Tasuke," which has been implemented at scaffold construction sites nationwide, primarily in Fukuoka Prefecture. It has been operational at various sites, including scaffold construction companies, rental companies, and construction companies, for projects such as apartment renovations, mobile antenna base station construction, and building renovations. It is mainly used for scaffold assembly and disassembly, as well as material lifting and lowering. 【Operational Achievements (Excerpt)】 ■ Industries - Scaffold construction companies, rental companies, construction companies ■ Types of Sites - Apartment renovations, mobile antenna base station construction, building renovations - New apartment construction, plant construction, and others *For more details, please refer to the PDF document or feel free to contact us.
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationHere are some customer testimonials for the scaffolding work lift "Sarutobi Tasuke." From Machikawa Temporary Construction Co., Ltd. in Fukuoka Prefecture, we received feedback that they were able to complete assembly as scheduled with a small number of people. Additionally, we have received many comments such as being able to install it solely with their own craftsmen, finishing a site with RC8F with just four people, and that it operates quietly without disturbing the residents. 【Customer Testimonials (Excerpt)】 ■ Assembly completed as scheduled with a small number of people ■ A site with a maximum of 18 levels can be constructed by 5 to 6 people ■ We decided to rent after seeing the site ■ No issues with installation using only our own craftsmen *For more details, please refer to the PDF document or feel free to contact us.
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationHere is the installation method for the scaffolding lift "Sarutobi Tasuke." First, install the bracket. Next, attach the 200V chain block and, after powering the chain block, operate the remote control. Check the safety devices and alarms, then assemble the cage and install the guide rails. Connect the chain block to the cage and install the cage. After that, proceed to install the subsequent guide rails. 【Installation Method (Excerpt)】 1. Install the bracket 2. Attach the 200V chain block 3. Power the chain block 4. Operate the remote control *For more details, please refer to the PDF document or feel free to contact us.
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationThe "Saru Tobi Tasuke Type I" is a lift for scaffolding work using wedge-type scaffolding. It is composed of components such as an aluminum cage (front), electric chain block, safety block, brackets, large suspension frame, and guide rails. Additionally, we also handle the "Saru Tobi Tasuke Type II," which was developed as a working lift for framed scaffolding based on the know-how of this product. 【Component Composition】 ■ Saru Tobi Tasuke Type I - Aluminum cage (front), aluminum cage (back), electric chain block (2 remote controls), safety block, brackets, large suspension frame, guide rails, guide fittings, rubber mat *For more details, please refer to the PDF materials or feel free to contact us.
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationAt Aile Co., Ltd., we offer "scaffolding construction services." We use scaffolding materials tailored to your needs, supporting scaffolding construction for low-rise residential buildings, offices, apartments, stores, factories, mid- to high-rise buildings, and event venue setups, all according to your objectives. Please feel free to contact us when you need our services. 【Features】 ■ Wedge-type scaffolding: Widely adaptable to various sites from low-rise residential buildings to mid- and high-rise structures. ■ Event scaffolding: Suitable for event venue setups, accommodating various purposes and scales. ■ Civil engineering scaffolding: Broadly applicable to various civil engineering sites such as retaining walls, slopes, and bridges. ■ Others: Fence & gate construction, temporary toilet rental, prefabricated sales. *For more details, please refer to the PDF materials or feel free to contact us.
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationThe scaffolding work lift "Sarutobi Tasuke" breaks the situation of a shortage of construction workers and craftsmen in scaffolding work. It allows efficient lifting operations with a minimal number of people, and it comes standard with a fall prevention device for the basket in case of emergencies. Since manual lifting is unnecessary, there is no concern about workers falling or materials dropping. It is registered in the Ministry of Land, Infrastructure, Transport and Tourism's new technology provision system "NETIS" (NETIS registration number: QS-110034-A). 【Features】 ○ Reliable safety to avoid dangers → Reduction in the number of workers per day, prevention of material drops, and outstanding safety ○ Peace of mind with enhanced functionality → Smooth ascent and descent with guide fittings and rails, can be installed even in narrow spaces ○ Patent: No. 4397431 For more details, please contact us or download the catalog.
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registration