iPROS Urban Planning
  • Search for products by classification category

    • Building Materials
      Building Materials
      35366items
    • Facilities
      Facilities
      55928items
    • Lighting and Interior
      Lighting and Interior
      17175items
    • Common materials
      Common materials
      36600items
    • Civil Engineering Materials
      Civil Engineering Materials
      9526items
    • Construction, work and methods
      Construction, work and methods
      27269items
    • Surveys, Measurements, and Services
      Surveys, Measurements, and Services
      29208items
    • IT/Software
      IT/Software
      32309items
    • others
      others
      76364items
    • Store and facility supplies
      Store and facility supplies
      4339items
    • Office and commercial supplies
      Office and commercial supplies
      11356items
    • Hospital and welfare facility supplies
      Hospital and welfare facility supplies
      948items
    • Logistics Equipment
      Logistics Equipment
      6748items
    • Energy and Resources
      Energy and Resources
      11533items
  • Search for companies by industry

    • Information and Communications
      7210
    • others
      7011
    • Building materials, supplies and fixtures manufacturers
      6665
    • Service Industry
      4638
    • Trading company/Wholesale
      2998
    • Other construction industries
      2453
    • Electrical equipment construction business
      642
    • Interior Design
      526
    • Facility Design Office
      490
    • Construction Consultant
      464
    • Architectural design office
      361
    • retail
      345
    • Warehousing and transport related industries
      322
    • Electricity, Gas and Water Industry
      290
    • General contractors and subcontractors
      286
    • Interior construction business
      275
    • Medical and Welfare
      274
    • Educational and Research Institutions
      257
    • Building Management
      252
    • Renovation and home construction industry
      223
    • Water supply and drainage construction business
      202
    • Housing manufacturers and construction companies
      186
    • Transportation
      161
    • Real Estate Developers
      155
    • Fisheries, Agriculture and Forestry
      126
    • Structural Design Office
      66
    • Finance, securities and insurance
      36
    • Restaurants and accommodations
      30
    • self-employed
      29
    • Mining
      26
    • Public interest/special/independent administrative agency
      18
    • Police, Fire Department, Self-Defense Forces
      18
    • Store and building owners
      9
    • Property Owner
      8
    • Government
      8
    • Individual
      8
  • Special Features
  • Ranking

    • Overall Products Ranking
    • Overall Company Ranking
Search for Products
  • Search for products by classification category

  • Building Materials
  • Facilities
  • Lighting and Interior
  • Common materials
  • Civil Engineering Materials
  • Construction, work and methods
  • Surveys, Measurements, and Services
  • IT/Software
  • others
  • Store and facility supplies
  • Office and commercial supplies
  • Hospital and welfare facility supplies
  • Logistics Equipment
  • Energy and Resources
Search for Companies
  • Search for companies by industry

  • Information and Communications
  • others
  • Building materials, supplies and fixtures manufacturers
  • Service Industry
  • Trading company/Wholesale
  • Other construction industries
  • Electrical equipment construction business
  • Interior Design
  • Facility Design Office
  • Construction Consultant
  • Architectural design office
  • retail
  • Warehousing and transport related industries
  • Electricity, Gas and Water Industry
  • General contractors and subcontractors
  • Interior construction business
  • Medical and Welfare
  • Educational and Research Institutions
  • Building Management
  • Renovation and home construction industry
  • Water supply and drainage construction business
  • Housing manufacturers and construction companies
  • Transportation
  • Real Estate Developers
  • Fisheries, Agriculture and Forestry
  • Structural Design Office
  • Finance, securities and insurance
  • Restaurants and accommodations
  • self-employed
  • Mining
  • Public interest/special/independent administrative agency
  • Police, Fire Department, Self-Defense Forces
  • Store and building owners
  • Property Owner
  • Government
  • Individual
Special Features
Ranking
  • Overall Products Ranking
  • Overall Company Ranking
  • privacy policy
  • terms of service
  • About Us
  • Careers
  • Advertising
  1. Home
  2. General contractors and subcontractors
  3. 横山基礎工事
  4. Product/Service List
General contractors and subcontractors
  • Added to bookmarks

    Bookmarks list

    Bookmark has been removed

    Bookmarks list

    You can't add any more bookmarks

    By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

    Free membership registration

横山基礎工事

addressHyogo/Sayo-cho, Sayo-gun/Zhensheng 385-2
phone0790-82-2215
  • Special site
  • Official site
last updated:Mar 11, 2022
横山基礎工事logo
  • Contact this company

    Contact Us Online
  • Company information
  • Products/Services(13)
  • catalog(2)
  • news(0)

横山基礎工事 List of Products and Services

  • category

1~13 item / All 13 items

Displayed results

Filter by category

Down the Hole Hammer Down the Hole Hammer
class="retina-image"

Temporary bridge temporary pier cable-stayed construction method "LIBRA Method"

Eliminating the need for high-altitude work while significantly shortening the construction process and improving safety.

The "LIBRA Method" is a temporary bridge and cantilever construction method that simplifies the securing of pile alignment by using upper steel panels as guides for pile driving, eliminating the need for scaffolding until the upper structure is erected, and streamlining the complex reinforcement of bridge piers on sloped terrain. Since high-altitude work is not required, it ensures safety while reducing work time. It is often adopted as part of national resilience initiatives and has a wealth of experience in construction access roads and work platforms for the expansion of highways to four lanes, as well as disaster recovery projects. 【Features】 - Enables parallel work on upper and lower structures, reducing waiting time and shortening processes. - The connection points of the newly installed panels to the pile bridge piers serve as guides for steel pipe installation, eliminating the need for dangerous guide material installation work. This improves safety while also reducing changes to the natural terrain and minimizing deforestation, thereby lessening the impact on the natural environment. - Drilling and installation can proceed simultaneously, allowing for stable construction from soft ground to hard ground. - Adaptable to various site conditions such as steep slopes in mountainous areas, rivers, dams, ports, and urban civil engineering. *For more details, please refer to the materials. Feel free to contact us with any inquiries.*

  • Bridge Construction

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Split-type spud barge "Super Deck"

We can secure heavy machinery scaffolding such as cranes necessary for water construction in inland areas like dam lakes, rivers, and ponds!

The "Super Deck" is a modular spud barge applicable for heavy machinery scaffolding for water construction in inland areas such as dams, rivers, and lakes. The installation and removal of steel materials led to decreased efficiency in water construction, and the high material costs for large crane work platforms contributed to rising construction costs. The development of the modular barge allows for immediate application to construction upon completion of transportation, assembly, outfitting, and inspection, which is expected to improve labor efficiency, safety, and cost-effectiveness. 【Features】 ■ The barge can be transported by trucks with a payload capacity of 15t or 10t. ■ After the barge transportation, assembly, and outfitting are completed, it can be immediately applied to construction. ■ All assembly, disassembly, outfitting, and release work can be done on the float, significantly reducing the risks associated with working at heights. ■ The time required for assembly, disassembly, outfitting, and release is short. ■ The standard specification allows for the installation of a 200t hydraulic crawler crane. *For more details, please refer to the PDF document or feel free to contact us.

  • Ground foundation construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Narrow Space Clearance Method

Low vibration, low noise, casing drilling! Enables various pile construction in confined spaces!

The "Narrow Space Clearance Construction Method" is a machine configuration that combines a narrow space-compatible drilling machine, modified from the specifications of a full-rotation all-casing general-purpose machine, with a hydraulic telescopic boom crawler and a hydrograb. This design minimizes the occupied area and adapts the machine for pile construction in confined spaces. The standard working space for a φ1500mm class drilling machine is more than 160m2, with a width of 8m, a length of 20m, and a headroom height of over 5.5m. 【Features】 ■ Capable of various pile construction in narrow spaces ■ Low vibration and low noise during casing drilling ■ All main machines are hydraulically driven ■ The combination of the narrow space-compatible drilling machine, hydraulic telescopic boom crawler, and hydrograb allows for construction under headroom restrictions of 5.5m *For more details, please refer to the PDF document or feel free to contact us.

  • Ground foundation construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Phoenix Stage Method

Achieving rapid construction of temporary piers in low headroom! Suitable for work platforms in low headroom situations such as road construction and railway bridges.

The "Phoenix Stage Construction Method" is a rapid construction method for temporary piers suitable for maintenance and repair work during dry periods. In spaces with a clearance of less than 6 meters, it reduces the number of welding points on support piles using a low-head telescopic crane and the newly developed Phoenix Hammer, enabling high-quality rapid construction. Together with the LIBRA method, it rapidly constructs a working stage for various repair and reinforcement works, as well as disaster recovery works, including low-head spaces within rivers, creating a comfortable construction period. 【Features】 - Rapid construction of piers in working spaces under 6 meters - Pre-construction of superstructures via stay cable equipment - Simultaneous parallel construction of ground assembly and pile driving - Use of steel pipes as support piles *For more details, please refer to the PDF materials or feel free to contact us.

  • Ground foundation construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Screwdriver construction method

Birth of a multi-driver compatible with hard rock formations! High-speed drilling with a hydraulic casing pipe drilling device!

The "Screw Driver Method" can accommodate a wide range of drilling diameters from φ800 to 3200mm. While performing casing drilling with a fully rotating all-casing drilling machine known for its drilling capabilities, it utilizes a screw-type middle drilling device to intermittently discharge large volumes of soil in an earth drill manner, achieving simultaneous improvements in speed, quietness, and environmental performance. This is a new standard that consolidates the features of conventional methods. 【Features of the Screw Driver Method for Hard Ground】 ■ Screw type ■ The storage capacity of excavated soil is approximately 8 to 25 times that of a hammer grab, significantly reducing the number of discharges ■ The discharge efficiency improves compared to a hammer grab in proportion to depth ■ Reliable shear excavation is possible for general earth, consolidated clay layers, gravel layers, sand and gravel layers, soft rock layers, etc. ■ It can be used not only for casing rotary drilling methods but also as a middle drilling device for pipes such as steel pipes and steel sheet piles. *For more details, please refer to the PDF materials or feel free to contact us.

  • Ground foundation construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Micro Joint Pile Method (Steel Pipe Sheet Pile Rock Embedding Method)

Acquisition of construction technology review certification! Directly driving steel pipe sheet piles into bedrock.

The "Micro Joint Pile Method" is a rock embedding method using special short-length jointed steel pipe sheet piles that eliminates the need for pre-drilling at the joint sections. By utilizing special short-length joints (micro joints) to shorten the pitch, the labor of pre-drilling is eliminated. By installing micro joint-type steel pipe sheet piles specifically designed for this method at approximately one-fourth the conventional short pitch, pre-drilling at the joint sections becomes unnecessary, allowing for simultaneous rock excavation and installation of steel pipe sheet piles in one process. 【Features】 ■ Construction technology review certification obtained ■ Direct installation of steel pipe sheet piles into rock layers is possible ■ Rental options for steel pipe sheet piles are available ■ Elimination of pre-drilling labor through pitch shortening with special short-length joints *For more details, please refer to the PDF materials or feel free to contact us.

  • Ground foundation construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Large-diameter deep steel pipe installation method (φ3200)

It is also used in construction to protect cities from flooding caused by guerrilla rainstorms! It is utilized in the construction of vertical shafts for access tunnels.

The "Large Diameter Deep Depth Steel Pipe Installation Method (φ3200)" is a method for directly rotating and installing steel pipe piles equipped with a drilling bit at the tip. It utilizes a full-circle rotary drilling machine with one of the largest diameters in the country, φ3200mm, capable of handling various underground construction projects. If necessary, large-diameter steel pipes can be directly rotated and installed into bedrock layers. The new technology of casing inner drilling allows for low-noise and low-vibration construction driven by hydraulic power, making it suitable for nighttime work in urban areas. 【Features】 - A method for directly rotating and installing steel pipe piles equipped with a drilling bit at the tip. - Utilizes a full-circle rotary drilling machine with one of the largest diameters in the country, φ3200mm, capable of handling various underground construction projects. - Large-diameter steel pipes can be directly rotated and installed into bedrock layers if necessary. - Effective in construction projects that protect cities from flooding caused by sudden heavy rains. - Can also be used for the construction of launch and arrival shafts for various shield projects. *For more details, please refer to the PDF materials or feel free to contact us.

  • Ground foundation construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Method Introduction] Catalogs are being distributed.

Proposal for accelerating the creation of a strong and flexible nation.

We, Yokoyama Foundation Construction, are a specialized contractor for foundation work, ranging from heavy temporary works to foundation construction. Until now, we have collaborated with many clients on various projects, providing technical proposals for shortening construction periods, reducing noise and vibration, and overcoming numerous challenging construction tasks, successfully implementing these solutions. In this catalog, we introduce various NETIS registered methods. For more details, please download the catalog or contact us through our website.

  • Foundation construction

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

A-CR Method (Absolute Crushing Method)

Acquisition of construction technology review certification! The latest technology for safe and rapid underground obstacle removal!

The A-CR method is a new system for safely removing underground obstacles using heavy machinery with low noise, low vibration, and a low center of gravity. It addresses the challenges of traditional underground obstacle removal methods through a crane-suspended crusher that operates freely within the casing. *For case studies, please visit our website via the related link.

  • Steel structure construction

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Capsule Ho-Paira Method

Acquisition of construction technology examination certification! Press-in construction of steel pipe sheet piles into hard ground with low noise and low vibration.

Solving various challenges in maintenance, repair, seismic reinforcement, and renewal construction with the concept of "inner excavation with capsules." 【Features】 ■ Obtained construction technology examination certification ■ Capable of handling difficult construction conditions for well foundation work ■ Possible to perform large-diameter and deep insertion construction ■ Achieves low noise, low vibration, splash prevention, and no soil discharge. Construction considerate of the surrounding environment is possible ■ Shortens construction period by improving soil discharge efficiency *For construction examples, please visit our website via the related links.

  • Other earthworks, foundation works, and exterior floors

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Construction method "LIBRA Method"

Significantly shorten the work process while improving the safety of construction work!

The "LIBRA Method" makes it easy to secure the center of the piles by using upper steel panels as guides for pile driving, eliminating the need for scaffolding until the upper structure is erected, and significantly reducing the complexity of reinforcing bridge piers on sloped terrain. It is developed with the aim of improving the safety of temporary bridges and temporary piers while pursuing a reduction in construction time, and simultaneously minimizing the impact on the natural environment. Additionally, since the connection points of the new panels to the pile bridge piers serve as guides for steel pipe driving, it reduces the work for shaping the base surface and installing guides on sloped surfaces, thereby enhancing safety and minimizing the impact on the natural environment. 【Features】 ■ Shortened construction period ■ High safety ■ Improved workability ■ Consideration for the natural environment ■ Stable construction 【Method Specifications】 ■ Pile Diameter: Φ457.2, Φ508, Φ609.6, Φ800 (mm) ■ Span Length: 6, 8, 10, 12.5, 20 (m) ■ Load: Automobile, crawler crane (70-200t lifting) *For more details, please refer to the catalog or feel free to contact us.

  • Other earthworks, foundation works, and exterior floors

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Modular Self-Lifting Platform "Multipurpose SEP (Seito)"

Supports various construction sites such as offshore, dam lakes, rivers, and ponds! Stable construction is possible.

The "Multipurpose SEP (Seito)" is a modular self-elevating platform that pursues mobility and deployment scale. Along with advanced foundation construction techniques from Yokoyama, such as the PRD-ROSE method and the Capsule Hoh-Pyra method, it can meet various needs in inland and offshore construction, including large-diameter deep excavation, steel pipe sheet piling, steel pipe pile driving, cast-in-place pile construction, replacement excavation, and ground improvement. It can be applied to existing pile work, temporary closure work, steel pipe sheet piling, and obstacle removal in river, dam lake, pond, and port construction. 【Features】 ■ It can be transported by sea with cranes and equipment onboard, allowing for quick securing of heavy machinery work platforms in ports and rivers. ■ It supports vertical loads with four legs and can elevate the platform, reducing the impact of waves in ports and swift currents in rivers, enabling stable construction. *For more details, please refer to the PDF document or feel free to contact us.

  • Foundation construction

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Large-diameter high-speed rock drilling system "PRD-ROSE method"

A system and construction that can be optimized according to site conditions using down-the-hole drilling!

The "PRD-ROSE Method" is a group of open-end down-the-hole hammer drilling technologies that allows for the selection of methods tailored to various construction conditions such as diverse terrain, soil types, and excavation diameters. With a crane-suspended construction style, it can flexibly accommodate the distance and elevation differences between heavy machinery scaffolding and the center of the pile, while also minimizing the installation area of the heavy machinery scaffolding. Thanks to a variety of drilling techniques, including large-diameter low-vibration and low-noise drilling with CD (Cluster Drill) type hammers for hard rock formations, rapid construction is achieved under diverse site conditions. 【SINGLE TYPE Features】 ■ Standard type for open excavation ■ Suitable for stable ground with stable borehole walls ■ Capable of large-diameter drilling up to 1,830mm *For more details, please refer to the PDF materials or feel free to contact us.

  • Ground foundation construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration
Prev 1 Next
  • イプロスがリアル展示会を主催します! AI/DX 営業・マーケティング展 出展社募集中 リード数・商談数が止まらない!新しいリアル展示会を提供 会期 2026年3月24日(火)~25日(水) 会場 東京ビッグサイト東4ホール 出展概要資料を進呈!
    • Contact this company

      Contact Us Online

    Products

    • Search for Products

    Company

    • Search for Companies

    Special Features

    • Special Features

    Ranking

    • Overall Products Ranking
    • Overall Company Ranking

    support

    • site map
    IPROS
    • privacy policy Regarding external transmission of information
    • terms of service
    • About Us
    • Careers
    • Advertising
    COPYRIGHT © 2001-2025 IPROS CORPORATION ALL RIGHTS RESERVED.
    Please note that the English text on this page is automatically translated and may contain inaccuracies.