iPROS Urban Planning
  • Search for products by classification category

    • Building Materials
      Building Materials
      36253items
    • Facilities
      Facilities
      57899items
    • Lighting and Interior
      Lighting and Interior
      17467items
    • Common materials
      Common materials
      36869items
    • Civil Engineering Materials
      Civil Engineering Materials
      10194items
    • Construction, work and methods
      Construction, work and methods
      29250items
    • Surveys, Measurements, and Services
      Surveys, Measurements, and Services
      29673items
    • IT/Software
      IT/Software
      33775items
    • others
      others
      101443items
    • Store and facility supplies
      Store and facility supplies
      4655items
    • Office and commercial supplies
      Office and commercial supplies
      12018items
    • Hospital and welfare facility supplies
      Hospital and welfare facility supplies
      1073items
    • Logistics Equipment
      Logistics Equipment
      7403items
    • Energy and Resources
      Energy and Resources
      12024items
  • Search for companies by industry

    • Information and Communications
      7299
    • others
      7275
    • Building materials, supplies and fixtures manufacturers
      6689
    • Service Industry
      4816
    • Trading company/Wholesale
      3120
    • Other construction industries
      2461
    • Electrical equipment construction business
      795
    • Construction Consultant
      680
    • General contractors and subcontractors
      676
    • Interior Design
      520
    • Housing manufacturers and construction companies
      502
    • Facility Design Office
      490
    • Architectural design office
      370
    • retail
      365
    • Warehousing and transport related industries
      338
    • Building Management
      320
    • Electricity, Gas and Water Industry
      287
    • Interior construction business
      284
    • Medical and Welfare
      278
    • Educational and Research Institutions
      257
    • Renovation and home construction industry
      232
    • Water supply and drainage construction business
      203
    • Transportation
      182
    • Real Estate Developers
      174
    • Fisheries, Agriculture and Forestry
      137
    • Structural Design Office
      65
    • Finance, securities and insurance
      41
    • Restaurants and accommodations
      34
    • self-employed
      31
    • Mining
      26
    • Public interest/special/independent administrative agency
      20
    • Police, Fire Department, Self-Defense Forces
      17
    • Property Owner
      9
    • Store and building owners
      9
    • Government
      9
    • Individual
      9
  • Special Features
  • Ranking

    • Overall Products Ranking
    • Overall Company Ranking
Search for Products
  • Search for products by classification category

  • Building Materials
  • Facilities
  • Lighting and Interior
  • Common materials
  • Civil Engineering Materials
  • Construction, work and methods
  • Surveys, Measurements, and Services
  • IT/Software
  • others
  • Store and facility supplies
  • Office and commercial supplies
  • Hospital and welfare facility supplies
  • Logistics Equipment
  • Energy and Resources
Search for Companies
  • Search for companies by industry

  • Information and Communications
  • others
  • Building materials, supplies and fixtures manufacturers
  • Service Industry
  • Trading company/Wholesale
  • Other construction industries
  • Electrical equipment construction business
  • Construction Consultant
  • General contractors and subcontractors
  • Interior Design
  • Housing manufacturers and construction companies
  • Facility Design Office
  • Architectural design office
  • retail
  • Warehousing and transport related industries
  • Building Management
  • Electricity, Gas and Water Industry
  • Interior construction business
  • Medical and Welfare
  • Educational and Research Institutions
  • Renovation and home construction industry
  • Water supply and drainage construction business
  • Transportation
  • Real Estate Developers
  • Fisheries, Agriculture and Forestry
  • Structural Design Office
  • Finance, securities and insurance
  • Restaurants and accommodations
  • self-employed
  • Mining
  • Public interest/special/independent administrative agency
  • Police, Fire Department, Self-Defense Forces
  • Property Owner
  • Store and building owners
  • Government
  • Individual
Special Features
Ranking
  • Overall Products Ranking
  • Overall Company Ranking
  • privacy policy
  • terms of service
  • About Us
  • Careers
  • Advertising
  1. Home
  2. Building materials, supplies and fixtures manufacturers
  3. 日本植生
  4. Product/Service List
Building materials, supplies and fixtures manufacturers
  • Added to bookmarks

    Bookmarks list

    Bookmark has been removed

    Bookmarks list

    You can't add any more bookmarks

    By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

    Free membership registration

日本植生

addressOkayama/Tsuyama-shi/Takaō 573-1
phone0868-28-0460
  • Special site
  • Official site
last updated:Aug 25, 2026
日本植生logo
  • Contact this company

    Contact Us Online
  • Before making an inquiry

    Download PDF
  • Company information
  • Products/Services(362)
  • catalog(127)
  • news(2)

日本植生 List of Products and Services

  • category

271~315 item / All 362 items

Displayed results

Filter by category

総合カタログ 総合カタログ
維持管理の負担や草刈の手間を減らしたい 維持管理の負担や草刈の手間を減らしたい
NETIS registered construction method NETIS registered construction method
Construction examples Construction examples
Construction examples by application. Construction examples by application.
Labor-saving and easy installation Labor-saving and easy installation
Disaster recovery Disaster recovery
Slope greening products Slope greening products
Wildlife damage prevention materials Wildlife damage prevention materials
Civil engineering materials Civil engineering materials
Watershed management (rivers and embankments) Watershed management (rivers and embankments)
Park and green space Park and green space
Rockfall prevention, rockfall protection, slope failure measures. Rockfall prevention, rockfall protection, slope failure measures.
お問合せ お問合せ
class="retina-image"

[Construction Example] Protecting World Heritage Landscapes with Seedless (Special) Products

An environmentally friendly vegetation sheet utilizing thinned wood (wood fiber)! Here are examples of its application with a seedless formulation.

We would like to introduce a case of the use of the thinning wood vegetation sheet "Harishiba Mock" in the improvement work of National Route 480 in Wakayama Prefecture. This was adopted without seeds for the road leading to the World Heritage Site of Kongobu-ji Temple on Mount Koya, located within the Koyasan Mount Koya National Park. This product, after installation, allows the thin cotton to adhere closely to the soil due to rainfall and night dew, protecting the seeds and fertilizer until germination. [Case Overview] ■ Installation Location: Wakayama Prefecture ■ Installation Date: December 2020 (Reiwa 2) ■ Quantity: 14,000 m² ■ Soil Type: Gravelly soil ■ Purpose: Road *For more details, please refer to the related links or feel free to contact us.

  • Planting work

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Example] Restoration using thinned wood for frames and a mix of native species.

Achieving uniform vegetation through soil adhesion effects! A case study of using different seed mixtures in vegetation mats and vegetation sheets.

This is an introduction to a case where the vegetation mat "Harishiba Kangaroo N" was installed at the Prefectural Single Mountain (Prefectural Management) Sasahiyu construction site in Shizuoka Prefecture. It is a combined work with log work (using thinned timber for the frame). Different seed mixtures were used for the vegetation mat work and vegetation sheet work. This product features fertilizer bags attached to a net at 40 cm intervals, installed along contour lines, which helps to disperse runoff water from rainfall and mitigate soil erosion. [Case Overview] ■ Construction Location: Shizuoka Prefecture ■ Construction Date: March 2007 (Heisei 19) ■ Quantity: 1,000 m² ■ Soil Type: Gravelly soil ■ Purpose: Erosion control *For more details, please refer to the related links or feel free to contact us.

  • Planting work

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Case] Mitigating Soil Erosion on Long Embankment Slopes with Gravel Mixture

Dispersing runoff water from rainfall to mitigate soil erosion! This was a case adopted due to the long embankment slope mixed with gravel.

We would like to introduce a case where the vegetation mat "Harishiba Kangaroo N" was installed as part of the disaster prevention (emergency measures project) construction funded by the disaster prevention and safety grant in Nagano Prefecture. Due to the long and steep embankment mixed with gravel, our product was chosen. This product adheres seeds and fertilizers to the entire surface of the thin cotton, achieving uniform vegetation through its soil adhesion effect. Please feel free to contact us if you have any inquiries. 【Case Overview】 ■ Installation Location: Nagano Prefecture ■ Installation Date: March 2022 (Year 4 of Reiwa) ■ Quantity: 1,200 m² ■ Soil Type: Sandy Soil ■ Application: Road *For more details, please refer to the related links or feel free to contact us.

  • Planting work

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Example] With Nichiue's vegetation mats, you can also distribute the construction period.

Achieving uniform vegetation through soil adhesion effects! Introducing a case where 4,500m2 of clayey soil was constructed.

We would like to introduce a case where the vegetation mat "Harishiba Kangaroo N" was installed during the improvement work on National Route 394 in Aomori Prefecture. To avoid summer construction, the upper section was completed in July and the lower section in September. This product features fertilizer bags attached to a net at 40 cm intervals, which are installed along contour lines to disperse runoff water from rainfall and mitigate soil erosion. Please feel free to contact us if you have any inquiries. 【Case Overview】 ■ Construction Location: Aomori Prefecture ■ Construction Date: October 2022 (Year 4 of Reiwa) ■ Quantity: 4,500 m² ■ Soil Type: Clayey Soil ■ Purpose: Road *For more details, please refer to the related links or feel free to contact us.

  • Planting work

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Example] Slope Protection for Road Embankments of Cohesive Soil

Installed in contour lines to disperse runoff from rainfall and mitigate soil erosion! Introducing examples of vegetation mat installation.

We would like to introduce a case where the vegetation mat "Harishiba Kangaroo" was installed in the Gunma Prefecture's standalone erosion control facility project (steep slope). We received an order from the Takasaki Civil Engineering Office and completed the installation of 300m2 of clay soil in April 2010. This product adheres seeds and fertilizers to a thin cotton surface, achieving uniform vegetation through its soil adhesion effect. Please feel free to contact us if you have any inquiries. 【Case Overview】 ■ Installation Location: Gunma Prefecture ■ Installation Date: April 2010 ■ Quantity: 300m2 ■ Soil Type: Clay Soil ■ Purpose: Road *For more details, please refer to the related links or feel free to contact us.

  • Slope protection material

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Example] Consideration for the Environment! Slope Protection Using Natural Materials (Coconut)

For the purposes of farm ponds, agricultural roads, and farmland improvement! A construction example of a mat with a hexagonal wire mesh attached to coconut fiber netting, excellent in erosion resistance and thermal insulation.

This is an introduction to a case where the "Kamakura Mat with Fertilizer Bag," made of hexagonal wire mesh, palm fiber net, and vegetation mat, was installed at the hometown agricultural road construction in Shimo City, Aomori Prefecture. We received an order from the Sanhachi Regional Bureau and completed the installation over an area of 5,000m2 with rocky and pebble soil. This product utilizes natural materials with consideration for the environment, and the thick palm net excels in erosion resistance and thermal insulation, protecting the surface soil. Please feel free to contact us if you have any inquiries. 【Case Overview】 ■ Installation Location: Aomori Prefecture ■ Installation Date: October 2005 (H17) ■ Quantity: 5,000m2 ■ Soil Type: Rocky and Pebble ■ Purpose: Pond, agricultural road, agricultural land improvement *For more details, please refer to the related links or feel free to contact us.

  • Slope protection material

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Example] Vegetation substrate mat with excellent workability for railway slope repair work.

Improvement of water retention and thermal insulation! A case study of a vegetation substrate mat using natural coconut fiber net suitable for soft rock.

We would like to introduce a case where the vegetation substrate mat "Green Format T30," which utilizes thinned wood with functional charcoal, was installed during the railway slope repair work in Niigata Prefecture. The slope next to the railway (with wire mesh) was constructed. This product not only has a water retention effect due to the substrate bag but also features a structure that utilizes thinned wood (wood wool fibers), providing excellent insulation and reducing frost heave. Please feel free to contact us if you have any inquiries. 【Case Overview】 ■ Construction Location: Niigata Prefecture ■ Construction Date: November 2021 (Year 3 of Reiwa) ■ Quantity: 400 m² ■ Soil Type: Gravelly soil ■ Application: Infrastructure *For more details, please refer to the related links or feel free to contact us.

  • Slope protection material

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

【Construction Example】We created a slope (embankment) where children can run around safely.

Greening up to soft rock II is possible with a two-layer vegetation substrate! An example of construction using protective materials.

We would like to introduce a case where the 'Green Format Mega Type' mat, made from thinning wood with functional charcoal, was used in safety measure construction in Kanagawa Prefecture. To allow children to run and play on the slope, protective materials were used in conjunction with the installation. This product features a two-layer structure utilizing thinning wood (wood wool fibers), which not only provides excellent moisture retention from the vegetation base layer below and the substrate bag above but also offers superior insulation and reduces frost heave. Please feel free to contact us if you have any inquiries. 【Case Overview】 ■ Installation Location: Kanagawa Prefecture ■ Installation Date: March 2022 (Year 4 of Reiwa) ■ Quantity: 50m² ■ Soil Type: Soft Rock ■ Purpose: Other *For more details, please refer to the related links or feel free to contact us.

  • Slope protection material

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Example] Special vegetation mat for greening alkaline soil in improved embankments.

Making alkaline soil greening possible! Due to a pH of 11.3 after the formation of improved embankment, a case where the vegetation mat (standard product) was changed.

We would like to introduce a case where the alkaline soil vegetation mat "Litmus Mat Blue" was installed in the Shizuoka Prefecture reservoir group maintenance project (emergency maintenance of reservoirs) for the Matsumoto Shinike embankment renovation work. Since the pH after the improved embankment formation was 11.3, we changed from the standard vegetation mat to this product. This product is equipped with soil improvement bags filled with neutralizing agents, plant growth promoters, and fertilizers at 20 cm intervals. Please feel free to contact us if you have any inquiries. 【Case Overview】 ■ Location: Shizuoka Prefecture ■ Construction Date: January 2022 (Year 4 of Reiwa) ■ Quantity: 130 m² ■ Soil Type: Clayey soil ■ Purpose: Maintenance of reservoirs, agricultural roads, and farmland *For more details, please refer to the related links or feel free to contact us.

  • Planting work

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Case] Greening of Cement Improved Embankment for Pond Dam Renovation

Order for the prefectural rural disaster prevention and mitigation project! Quantity is 1,300m2, soil type is clayey soil.

We would like to introduce a case where our alkaline soil vegetation mat "Litmus Mat Blue" was installed in the Noda Pond embankment renovation project as part of the prefectural rural disaster prevention and mitigation project. This was commissioned by the Toyama Prefectural Takaoka Forestry and Agriculture Promotion Center, and the vegetation mat was changed from the standard type to accommodate the cement-improved embankment (pH 8.0 to 9.4). This product was used for pond, farm road, and farmland improvement purposes. Please feel free to consult us when you need our services. 【Case Overview】 ■ Project Name: Prefectural Rural Disaster Prevention and Mitigation Project Noda Pond Embankment Renovation ■ Location: Toyama Prefecture ■ Construction Date: October 2022 (Year 4 of Reiwa) ■ Quantity: 1,300 m² ■ Soil Type: Clayey Soil *For more details, please refer to the related links or feel free to contact us.

  • Slope protection material

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Example] Greening of Cement Improved Embankment (Sandy Soil) for Road Maintenance Work

Construction on cement-improved embankment with unknown pH! Quantity is 1,000m2, soil type is sandy soil.

We would like to introduce a case where our alkaline soil vegetation mat "Litmus Mat Blue" was installed during road improvement work. This project was commissioned by the Tajima Prefectural Office in Hyogo Prefecture and was carried out within Hyogo Prefecture. It was applied to cement-improved embankments with an unknown pH. This product greening alkaline soil with a pH of about 9.0. Please feel free to consult us when you need our services. 【Case Overview】 ■ Project Name: Road Improvement Work ■ Installation Location: Hyogo Prefecture ■ Installation Date: May 2022 (Year 4 of Reiwa) ■ Quantity: 1,000 m² ■ Soil Type: Sandy Soil *For more details, please refer to the related links or feel free to contact us.

  • Slope protection material

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Case] Change from vegetation sheet to improved embankment for bypass of national highway.

A case where the vegetation sheet (environmental product) was changed for improved embankment (approximately pH 9.8)!

We would like to introduce a case where our alkaline soil vegetation mat "Litmus Mat Blue" was installed at the improvement work of the National Route 18 Sakaki Saruhashi BP. This project was commissioned by the Kanto Regional Development Bureau of the Ministry of Land, Infrastructure, Transport and Tourism and was carried out in Nagano Prefecture. Due to the improved embankment (approximately pH 9.8), we changed from the environmental product vegetation sheet. 【Case Overview】 ■ Project Name: Improvement Work of National Route 18 Sakaki Saruhashi BP ■ Installation Location: Nagano Prefecture ■ Installation Date: March 2022 (Year 4 of Reiwa) ■ Quantity: 1,600 m² ■ Soil Type: Sandy Soil *For more details, please refer to the related links or feel free to contact us.

  • Slope protection material

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Example] Environmental Conservation in the Development of an Island Children's Garden with Wildflower Mixture

A case where a mixture of wild plants was adopted from the perspective of environmental conservation in the remote island (Sado City)!

We would like to introduce a case where our acidic soil vegetation mat "Litmus Mat Red" was installed during the construction of a children's garden. This project was commissioned by the Sado City Hall in Niigata Prefecture and was carried out within Niigata Prefecture. A mixture of wild grasses was adopted from the perspective of environmental conservation on the remote island (Sado City). This product features soil improvement bags filled with neutralizers and plant growth promoters, installed at 20 cm intervals, and is a vegetation mat with a thin cotton layer on the back that has seeds and fertilizers sprayed across its surface. [Case Overview] ■ Project Name: Children's Garden Construction ■ Location: Niigata Prefecture ■ Construction Date: March 2022 (Year 4 of Reiwa) ■ Quantity: 1,000 m² ■ Soil Type: Gravelly Soil *For more details, please refer to the related links or feel free to contact us.

  • Slope protection material

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Example] Mountain conservation work promoting natural infiltration with greening foundation products.

Order from the Shikoku Forest Management Bureau of the Forestry Agency! The soil type is gravelly soil, the quantity is 400m2, and it is for erosion control purposes.

We would like to introduce a case where the vegetation mat "Kyojingar ST60" with a green foundation (mortar bags) for promoting natural invasion was installed in a restoration forestry project. This project was commissioned by the Shikoku Forest Management Bureau of the Forestry Agency and was carried out in Kochi Prefecture. The soil type was gravelly soil, with a quantity of 400m2, for forestry purposes. The solidified mortar bags maintain a long-term growth foundation. Additionally, a special thin cotton protects the surface layer of the slope for an extended period until the plants become established. [Case Overview] ■ Project Name: Restoration Forestry Project ■ Location: Kochi Prefecture ■ Construction Date: June 2019 (Reiwa 1) ■ Quantity: 400m2 ■ Soil Type: Gravelly Soil *For more details, please refer to the related links or feel free to contact us.

  • Slope protection material

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Example] Road maintenance and repair in a national park with greening foundation work and natural intrusion promotion work.

Construction within a national park in Ehime Prefecture! The area is 300m2, and the soil type is gravelly soil.

We would like to introduce a case where the vegetation mat "Kyojingar ST60" with a green infrastructure foundation (mortar bags) was installed as part of road maintenance and repair work. This project was commissioned by the Ministry of the Environment, Chugoku-Shikoku Regional Environment Office, and was carried out within a national park in Ehime Prefecture. The area covered was 300m², and the soil type was gravelly soil. The solidified mortar bags maintain a growth foundation over the long term. Additionally, a special thin cotton layer protects the surface until the plants become established. [Case Overview] ■ Project Name: Road Maintenance and Repair Work ■ Location: Ehime Prefecture ■ Date of Construction: October 2021 (R3) ■ Area: 300m² ■ Soil Type: Gravelly Soil *For more details, please refer to the related links or feel free to contact us.

  • Slope protection material

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Example] Easily created with a backhoe! For labor saving and shortening construction time.

A case that tracked the period from before construction, upon completion, and after 2 months, 3 years and 3 months, 5 years and 5 months, and 7 years and 5 months!

We would like to introduce a case where our large vegetation soil bag "Mega Medel" was used in road maintenance and repair work. This project was commissioned by the Ritto City Hall in Shiga Prefecture and was carried out on a forest road within Shiga Prefecture. The quantity was 25 bags, and the soil type was gravelly soil. Our product can be easily produced with a backhoe. Compared to conventional vegetation soil bags, it offers labor savings and a reduction in construction time. 【Case Overview】 ■ Project Name: Road Maintenance and Repair Work ■ Location: Shiga Prefecture ■ Construction Date: March 2015 (H27) ■ Quantity: 25 bags ■ Soil Type: Gravelly Soil *For more details, please refer to the related links or feel free to contact us.

  • Slope protection material

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Case] Contributing to landscape preservation with large soil bags that can be greened.

The use of large sandbags combined with landscape greening contributes to landscape preservation.

We would like to introduce a case where our large vegetation soil bag "Mega Medel" was used in road maintenance and repair work. This project was commissioned by the Seto City Hall in Aichi Prefecture and was carried out within Aichi Prefecture. The soil type was sandy soil, and the quantity was 25 bags. The use of large soil bags, combined with landscape greening, contributes to landscape preservation. It is expected to reduce UV degradation through vegetation cover. 【Case Overview】 ■ Project Name: Road Maintenance and Repair Work ■ Location: Aichi Prefecture ■ Construction Date: January 2021 (Year 3 of Reiwa) ■ Quantity: 25 bags ■ Soil Type: Sandy Soil *For more details, please refer to the related links or feel free to contact us.

  • Slope protection material
  • Sandbags
  • River construction

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Case] Adopted as an alternative method for simple spray formwork at the end of the construction period.

The deadline is approaching, and this is a case where an alternative method was adopted for the simple spray application frame construction!

We would like to introduce a case where our vegetation substrate mat "Kyojingar," which includes green infrastructure (mortar bags), was installed during the construction of the Hayashi Kaiketsu Akaboshi Line. This project was commissioned by the Western Tokushima Prefectural Bureau and carried out in Tokushima Prefecture. As the construction deadline approached, it was adopted as an alternative method to the simple spraying method. The solidified mortar bags maintain a long-term growth foundation and protect the surface of the slope through a composite effect with high-strength nets. [Case Overview] ■ Project Name: Hayashi Kaiketsu Akaboshi Line Construction ■ Location: Tokushima Prefecture ■ Construction Date: March 2021 (Year 3 of Reiwa) ■ Quantity: 120m2 ■ Soil Type: Soft Rock *For more details, please refer to the related links or feel free to contact us.

  • Slope protection material

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Example] Greening using native species in road construction work in a nature conservation area.

Use of wire mesh! An example of seed mixture that includes wild grasses because it is a nature conservation area.

We would like to introduce a case where our vegetation substrate mat "Kyojingar" with greening foundation work (mortar bags) was installed during the construction of National Route 42. This project was commissioned by the Kise National Route Office of the Chubu Regional Development Bureau, Ministry of Land, Infrastructure, Transport and Tourism, and was carried out in Mie Prefecture. It used a combination of wire mesh. The seed mixture consists of wild grasses due to the area being a nature conservation zone. The mortar bags before curing are flexible, allowing them to adhere closely to the uneven surfaces of the slopes. They cure naturally with rain (no watering required), creating small steps on the slope to form a stable growth foundation. 【Case Overview】 ■ Project Name: National Route 42 Construction Project ■ Location: Mie Prefecture ■ Construction Date: March 2022 (Year 4 of Reiwa) ■ Quantity: 1,400 m² ■ Soil Type: Soft Rock *For more details, please refer to the related links or feel free to contact us.

  • Slope protection material

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Case] Disaster-resistant road construction project. Change from frame work (small area).

Order for disaster-resistant road construction project! Example of change from legal framework work.

We would like to introduce a case where our vegetation substrate mat "Kyojingar" with greening foundation (mortar bags) was installed in the major local road slope protection work as part of the disaster-resistant road construction project. This was commissioned by the Okitama General Office in Yamagata Prefecture. The soil type was clayey soil, and the installation was done on a 90m² road. The solidified mortar bags maintain a long-term growth foundation and protect the slope surface through a composite effect with high-strength nets. [Case Overview] ■ Project Name: Disaster-Resistant Road Construction Project Major Local Road Slope Protection Work ■ Installation Location: Yamagata Prefecture ■ Installation Date: December 2021 (Year 3 of Reiwa) ■ Quantity: 90m² ■ Soil Type: Clayey Soil *For more details, please refer to the related links or feel free to contact us.

  • Slope protection material

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Example] Greening work with mortar bags for disaster prevention on the slope (embankment) behind the building.

Mixed jade and stone soil, construction for 500m2! A case study followed up 6 months after construction.

We would like to introduce a case where our greening foundation work (mortar bags) with the vegetation substrate mat "Kyojingar" was implemented in the disaster prevention construction behind the government building. This project was commissioned by the Iinan Town Hall in Shimane Prefecture and carried out within Shimane Prefecture. The soil type consisted of rock and gravel, covering an area of 500m2. Before solidification, the mortar bags are flexible, allowing them to adhere closely to the uneven surfaces of the slopes. They solidify naturally with rain (no watering required), creating small steps on the slope to form a stable growth foundation. 【Case Overview】 ■ Project Name: Disaster Prevention Construction Behind the Government Building ■ Location: Shimane Prefecture ■ Construction Date: December 2021 (Year 3 of Reiwa) ■ Quantity: 500m2 ■ Soil Type: Rock and Gravel *For more details, please refer to the related links or feel free to contact us.

  • Slope protection material

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Example] Soil erosion control work in sandy soil (shirasu). Greening of the waterway section as well!

The Waterway Department uses Ryokkasuiri! Here are examples of its application for soil conservation in sandy soils.

We would like to introduce a case where our greening foundation work (mortar bags) vegetation substrate mat "Kyojingar" was implemented in the restoration and erosion control project. This was commissioned by the Osumi Regional Promotion Bureau of Kagoshima Prefecture and carried out within Kagoshima Prefecture. It involves a siliceous slope, with "Ryokkasuijiro" used in the waterway section. "Ryokkasuijiro" is a vegetation mat specifically designed for greening waterways, filled with topsoil on the front side. [Case Overview] ■ Project Name: Restoration and Erosion Control Project ■ Location: Kagoshima Prefecture ■ Construction Date: October 2022 (Year 4 of Reiwa) ■ Quantity: 5,400 m² ■ Soil Type: Sandy soil *For more details, please refer to the related links or feel free to contact us.

  • Slope protection material

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Example] Rock and Pebble Slope (Embankment) Rockfall Countermeasures and Prevention

Order from the Hata Civil Engineering Office in Kochi Prefecture! Case study on rockfall countermeasures and prevention.

We would like to introduce a case where our "rockfall protection net (cover type/pocket type)" was installed as part of the disaster prevention and safety grant project. This project was commissioned by the Hata Civil Engineering Office in Kochi Prefecture and was carried out within Kochi Prefecture. The soil type consisted of rock and gravel, and the work was done for rockfall countermeasures and prevention. The method involves securing floating stones and rolling stones with wire mesh and wire ropes to prevent rockfall within the mesh in advance. 【Case Overview】 ■ Project Name: Disaster Prevention and Safety Grant Project ■ Location: Kochi Prefecture ■ Construction Date: August 2023 (Year 5 of Reiwa) ■ Quantity: 800 m² ■ Soil Type: Rock and gravel *For more details, please refer to the related links or feel free to contact us.

  • Rockfall prevention agent

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Example] Rockfall measures and prevention with rockfall protective nets. Road disaster prevention work.

The soil consists of gravelly soil, rock blocks, and pebbles, with examples of rockfall countermeasures and preventive works within an area of 850m2!

We would like to introduce a case where our "rockfall protection net (cover type/pocket type)" was installed as part of the road disaster prevention work on the Major Local Road Ibaraki-Kameoka Line. This project was commissioned by the Ibaraki Civil Engineering Office in Osaka Prefecture and was carried out within Osaka Prefecture. The soil conditions included gravelly soil, rock blocks, and cobbles, with rockfall countermeasures and preventive work conducted over an area of 850m2. The method involves securing floating stones and rolling stones with wire mesh and wire ropes to prevent rockfall within the mesh in advance. 【Case Overview】 ■ Project Name: Road Disaster Prevention Work on the Major Local Road Ibaraki-Kameoka Line ■ Location: Osaka Prefecture ■ Construction Date: March 2023 (Year 5 of Reiwa) ■ Area: 850m2 ■ Soil Type: Gravelly soil, rock blocks, cobbles *For more details, please refer to the related links or feel free to contact us.

  • Rockfall prevention agent

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Case] Measures and Preventive Works for Rockfall on Forest Roads

Examples of rockfall countermeasures and preventive works in a 1,300m2 area of clay, rock masses, and cobblestone soil!

We would like to introduce a case where our "rockfall protection net (cover type/pocket type)" was installed during the Ohira Forest Road improvement project. This was commissioned by the Western Tottori General Office and carried out within Tottori Prefecture. It involved rockfall countermeasures and preventive work over an area of 1,300 m² with soil types including clayey soil, boulders, and gravel. The method involves securing floating stones and rolling stones with wire mesh and wire ropes to prevent rockfall within the mesh in advance. 【Case Overview】 ■ Project Name: Ohira Forest Road Improvement Project ■ Location: Tottori Prefecture ■ Construction Date: October 2022 (Year 4 of Reiwa) ■ Area: 1,300 m² ■ Soil Type: Clayey soil, boulders, gravel *For more details, please refer to the related links or feel free to contact us.

  • Rockfall prevention agent

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Example] Rockfall protection fence construction with posts installed directly into the ground.

Case study of rockfall prevention and mitigation works in a 250m2 area of rock and gravel soil!

We would like to introduce a case where our wire rope-supported rockfall protection fence, "Rabbit Fence," was installed for the rockfall countermeasure work at the slope of the Nada Industrial Park. The project was commissioned by the Kurayoshi City Hall in Tottori Prefecture and was carried out within the prefecture. It involved rockfall countermeasure and prevention work over an area of 250m² with boulder and gravel soil. The "Rabbit Fence" employs an anchoring foundation method for fixing the posts, allowing the posts to be installed directly into the ground. 【Case Overview】 ■ Project Name: Rockfall Countermeasure Work at Nada Industrial Park Slope ■ Location: Tottori Prefecture ■ Construction Date: August 2023 (Year 5 of Reiwa) ■ Area: 250m² ■ Soil Type: Boulder and Gravel *For more details, please refer to the related links or feel free to contact us.

  • Rockfall prevention agent

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Case] (Private) Rockfall prevention measures for slope restoration work at temples and shrines.

The soil type is clayey soil, rock masses, and pebbles, with examples of restoration work in a 250m² area!

We would like to introduce a case where our "Tezak Super Lock (G-spec)" was used in the restoration work of the slope at Kinkai Komyoji Temple. This project was commissioned privately and carried out in Kyoto Prefecture. The soil types included clayey soil, rock masses, and cobblestones, covering an area of 250m2 for the restoration work. This method is designed to suppress the initial movement of scattered boulders and floating stones on the slope by utilizing the flexibility of wire ropes and the restraining and supporting power of anchors. [Case Overview] ■ Project Name: Restoration Work of the Slope at Kinkai Komyoji Temple ■ Location: Kyoto Prefecture ■ Construction Date: May 2022 (Year 4 of Reiwa) ■ Area: 250m2 ■ Soil Types: Clayey soil, rock masses, cobblestones *For more details, please refer to the related links or feel free to contact us.

  • Rockfall prevention agent

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Case] Rockfall Countermeasures and Prevention Work for Important Infrastructure (Slope near Railway Crossing)

The soil type is gravelly soil, and it is an example of rockfall countermeasures and preventive construction within a range of 1,500 m²!

We would like to introduce a case where our "Tezak Super Lock (contact type)" was implemented in slope maintenance work near a railroad crossing. This project was commissioned by a private entity and carried out in Hyogo Prefecture. The soil type was gravelly soil, and it involved rockfall countermeasures and preventive work over an area of 1,500 m2. The contact type method involves installing thick wire mesh as auxiliary material to prevent erosion from gravel and other materials while preventing floating and rolling rockfalls. [Case Overview] ■ Project Name: Slope Maintenance Work Near Railroad Crossing ■ Location: Hyogo Prefecture ■ Construction Date: February 2021 (Reiwa 3) ■ Area: 1,500 m2 ■ Soil Type: Gravelly Soil *For more details, please refer to the related links or feel free to contact us.

  • Rockfall prevention agent

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Example] Rockfall countermeasure and prevention work in areas with widespread boulders and gravel soil.

Examples of rockfall countermeasures and preventive works in a 200m² area with soil consisting of rock masses and gravel!

We would like to introduce a case where our "Tezak Super Lock (net type)" was installed for the slope protection work on the Major Local Road Nara Kasagi Line. This project was commissioned by the Nara Prefectural Civil Engineering Office and was carried out within Nara Prefecture. The soil type consists of rock blocks and pebbles, and it is a rockfall countermeasure and prevention work over an area of 200m2. The net type method involves installing wire ropes at 50cm intervals as auxiliary components, and it is applicable to rock slopes that are at risk of loose rocks and rolling stones. [Case Overview] ■ Project Name: Slope Protection Work on the Major Local Road Nara Kasagi Line ■ Location: Nara Prefecture ■ Construction Date: February 2022 (Year 4 of Reiwa) ■ Area: 200m2 ■ Soil Type: Rock blocks and pebbles *For more details, please refer to the related links or feel free to contact us.

  • Rockfall prevention agent

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Example] Rockfall protection fence construction that does not require a concrete foundation.

No need for concrete foundations; installation can be done on-site! Example from February 2013.

This is an introduction to a case where a wire rope-supported rockfall protection fence called "Rabbit Fence" was constructed as part of the prefectural road improvement project. The project was commissioned by the Takahagi Construction Office in Ibaraki Prefecture and was carried out in Ibaraki Prefecture. The soil type consisted of rock and gravel, with a quantity of 50m². This method allows for the installation of posts directly into the ground by using an anchor foundation for securing the posts. 【Case Overview】 ■ Project Name: Prefectural Road Improvement Project ■ Location: Ibaraki Prefecture ■ Construction Date: February 2013 (Heisei 25) ■ Quantity: 50m² ■ Soil Type: Rock and Gravel *For more details, please refer to the related links or feel free to contact us.

  • Rockfall prevention agent

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Case] Close-contact rockfall prevention (rope laying work) for slope and flooding countermeasures.

Case from June 2021 (R3)! Implemented using a method that combines rope laying work with a thick wire mesh.

We would like to introduce a case where we installed the "Tezak Super Lock (contact type)" for rockfall prevention using rope laying work in the slope and flooding countermeasure construction of the town road Shimo-Harayama Kaiku Line. This project was commissioned by the Kawai Town Hall in Iwate Prefecture and was carried out in Iwate Prefecture. The area covered was 3,500 m², aimed at rockfall countermeasures and prevention. This method is designed to suppress the initial movement of scattered loose rocks and boulders on slopes through the flexibility of wire ropes and the restraining and supporting power of anchors. 【Case Overview】 ■ Project Name: Slope and Flooding Countermeasure Construction of the Town Road Shimo-Harayama Kaiku Line ■ Location: Iwate Prefecture ■ Construction Date: June 2021 (Year 3 of Reiwa) ■ Area: 3,500 m² ■ Purpose: Rockfall countermeasures and prevention *For more details, please refer to the related links or feel free to contact us.

  • Rockfall prevention agent

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Example] Slope repair. Rich in flexibility, suppressing the initial movement of loose stones and floating rocks.

Case study using Ribmat Green R-20! Conducted in October 2019 (R1).

This is an introduction to a case where the "Tezak Super Lock (G-spec)" was installed for rockfall prevention as part of the municipal land improvement project slope repair work. The project was commissioned by the Chikuma City Hall in Nagano Prefecture and was carried out in Nagano Prefecture. The area covered was 150m², implemented as a rockfall countermeasure and prevention. This method utilizes the flexibility of wire ropes and the restraining and supporting power of anchors to suppress the initial movement of loose stones and boulders scattered on the slope. [Case Overview] ■ Project Name: Municipal Land Improvement Project Slope Repair Work ■ Location: Nagano Prefecture ■ Date of Construction: October 2019 (R1) ■ Area: 150m² ■ Purpose: Rockfall Countermeasure and Prevention *For more details, please refer to the related links or feel free to contact us.

  • Rockfall prevention agent

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Example] Erosion prevention of accumulated soil and prevention of rolling stone-type rockfalls through forestry conservation work.

Examples of construction methods suitable for sites where large and small boulders, floating stones, and soil are mixed!

We would like to introduce a case where the "Tezak Super Lock (G-spec)" was installed as a rockfall prevention rope work in the restoration and mountain conservation project in the Nabewari area. This project was commissioned by the Gunma Forest Management Office of the Kanto Regional Forest Management Bureau and was carried out in Gunma Prefecture. The area covered is 400m², with the soil type being rock and gravel. This method involves the installation of wire mesh and erosion control mats as auxiliary materials to prevent the erosion of accumulated soil while primarily preventing rockfall in the form of rolling stones. 【Case Overview】 ■ Project Name: Nabewari Area Restoration and Mountain Conservation Project ■ Location: Gunma Prefecture ■ Date of Construction: July 2020 (Reiwa 2) ■ Area: 400m² ■ Soil Type: Rock and Gravel *For more details, please refer to the related links or feel free to contact us.

  • Earth retaining support

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Example] Rockfall Protection Net (Cover Type) for Road Slope Repair and Maintenance Work

Application for rockfall countermeasures and prevention, case from October 2022 (R4), quantity 3,500 m².

We would like to introduce a case where "rockfall protection nets (cover type/pocket type)" were installed during the slope repair and maintenance work on the municipal road Wakamikko - Shimokurosawa line. This project was commissioned by the Hokuto City Hall in Yamanashi Prefecture and was carried out in Yamanashi Prefecture. The area covered was 3,500 m², aimed at rockfall countermeasures and prevention. The method used (cover type) involves securing loose stones and rolling stones with wire mesh and wire ropes, thereby preventing rockfall within the mesh in advance. 【Case Overview】 ■ Project Name: Slope Repair and Maintenance Work on Municipal Road Wakamikko - Shimokurosawa Line ■ Location: Yamanashi Prefecture ■ Construction Date: October 2022 (Year 4 of Reiwa) ■ Area: 3,500 m² ■ Purpose: Rockfall countermeasures and prevention *For more details, please refer to the related links or feel free to contact us.

  • Rockfall prevention agent

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Example] Rockfall Protection Net on Steep Slope by the Roadside

The construction site in February 2021 (R3) is an example from Shizuoka Prefecture! The quantity is 1,150 m².

We would like to introduce a case where "rockfall protection nets (cover type/pocket type)" were installed during the reconstruction work of National Route 136. This project was commissioned by the Shimoda Civil Engineering Office in Shizuoka Prefecture and was carried out in Shizuoka Prefecture. The quantity was 1,150 m², and the purpose was rockfall countermeasures and prevention. The method used (pocket type) involves installing openings with H-shaped supports at the top of the wire mesh to catch falling rocks from the upper source within the mesh. 【Case Overview】 ■ Project Name: Reconstruction Work of National Route 136 ■ Location: Shizuoka Prefecture ■ Construction Date: February 2021 (Year 3 of Reiwa) ■ Quantity: 1,150 m² ■ Purpose: Rockfall countermeasures and prevention *For more details, please refer to the related links or feel free to contact us.

  • Rockfall prevention agent

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Case] Rockfall Prevention and Measures for Road Slopes

A method of preventing falling rocks within a wire mesh by securing floating stones and rolling stones with wire mesh and wire ropes!

We would like to introduce a case of "rockfall protection netting (cover type/pocket type)" installed during the slope work on the Kōbikumi-hama Line. This project was commissioned by the Toyooka Civil Engineering Office in Hyogo Prefecture and was carried out in Hyogo Prefecture. The quantity is 950m², and its purpose is rockfall prevention and mitigation. Please feel free to contact us if you have any inquiries. 【Case Overview】 ■ Project Name: Slope Work on the Kōbikumi-hama Line ■ Location: Hyogo Prefecture ■ Construction Date: August 2021 (Year 3 of Reiwa) ■ Quantity: 950m² ■ Purpose: Rockfall prevention and mitigation *For more details, please refer to the related links or feel free to contact us.

  • Rockfall prevention agent

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Case] An example of a site where it is difficult to grasp the location and quantity of rockfall sources.

A case of a construction method suitable for sites where it is difficult to grasp the location and quantity of rockfall sources, such as when surface soil is fully accumulated.

This is an introduction to a case where the rockfall prevention rope installation "Tezak Super Lock (G-spec)" was implemented in restoration and erosion control work. The project was commissioned by the Higashi-yo Regional Bureau of Ehime Prefecture and carried out in Ehime Prefecture. It involved securing scattered rockfall sources and preventing the occurrence of new rolling stones and floating stones due to surface erosion. The accompanying erosion control mat is designed to protect the surface layer over the long term, combining erosion prevention effects with a foundation for plant growth. 【Case Overview】 ■ Project Name: Restoration and Erosion Control Work ■ Location: Ehime Prefecture ■ Date of Construction: 2020 (R2) ■ Area: 700 m² ■ Purpose: Rockfall countermeasures and prevention *For more details, please refer to the related links or feel free to contact us.

  • Earth retaining support

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Example] Rockfall prevention that accommodates difficult machine access in the back of residential houses and on mountain slopes.

No need for large machinery! Examples of construction methods that do not require large or specialized machinery.

We would like to introduce a case where the rockfall prevention rope installation "Teza Super Lock (G-spec)" was carried out as part of the Hiji River levee maintenance work. This was ordered by the Ozu River National Highway Office of the Shikoku Regional Development Bureau, Ministry of Land, Infrastructure, Transport and Tourism. The construction site is in Ehime Prefecture, with a quantity of 150m². In this method, the necessary machinery consists mainly of a hand hammer and an air compressor, allowing for construction even in difficult-to-access areas such as behind private homes or on mountain slopes. 【Case Overview】 ■ Project Name: Hiji River Levee Maintenance Work ■ Construction Location: Ehime Prefecture ■ Construction Date: 2019 (Reiwa 1) ■ Quantity: 150m² ■ Purpose: Rockfall countermeasures and prevention *For more details, please refer to the related links or feel free to contact us.

  • Rockfall prevention agent

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Case] Minimizing the felling of standing trees on slopes for rockfall prevention in parks.

It is possible to minimize the felling of standing trees on slopes! A case using colored materials.

This is an introduction to a case where the rockfall prevention rope installation "Teza Super Lock (net type)" was implemented as part of the rockfall countermeasure construction at Minoo Park. The project was commissioned by the Ikeda Civil Engineering Office in Osaka Prefecture and carried out in Osaka Prefecture. The purpose is rockfall countermeasures and prevention, with a quantity of 70m². This method suppresses the initial movement of loose stones and floating rocks scattered on the slope through the restraining and supporting power of flexible wire ropes and anchors. 【Case Overview】 ■ Project Name: Minoo Park Rockfall Countermeasure Construction ■ Location: Osaka Prefecture ■ Construction Date: 2023 (R5) ■ Quantity: 70m² ■ Purpose: Rockfall Countermeasures and Prevention *For more details, please refer to the related links or feel free to contact us.

  • Rockfall prevention agent

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Example] On rock slopes with the risk of falling rocks such as floating stones and rolling stones.

A wire rope net is installed tightly against the slope! It suppresses the initial movement of loose stones and floating rocks, preventing them from becoming falling rocks.

We would like to introduce a case where the "Tezak Super Lock (net type)" was installed as a rockfall prevention rope work in the emergency response construction for the Wazuka Ide Line disaster prevention and safety grant. This project was commissioned by the Yamashiro North Civil Engineering Office in Kyoto Prefecture and was carried out in Kyoto Prefecture. The area covered is 600m2, and its purpose is rockfall countermeasures and prevention. This method involves installing wire ropes at 50cm intervals as auxiliary materials and is applicable to rock slopes that are at risk of floating stones and rolling stones. 【Case Overview】 ■ Project Name: Wazuka Ide Line Disaster Prevention and Safety Grant Emergency Response Construction ■ Location: Kyoto Prefecture ■ Construction Date: 2021 (Year 3 of Reiwa) ■ Area: 600m2 ■ Purpose: Rockfall countermeasures and prevention *For more details, please refer to the related links or feel free to contact us.

  • Rockfall prevention agent

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Example] Greening of the asphalt (pavement) factory employee parking lot.

Standard equipped with automatic irrigation system! A case study of thin-layer parking greening method installed on pavement.

In the fiscal year 2018 (H30), we would like to introduce a case where the "Tafutafu Park 55," a type of green parking method installed on pavement, was implemented in the greening project of a private factory employee parking lot. The existing asphalt was excavated by 55mm, and our product was embedded. Due to the limited number of parking spaces for employees, the project was divided into sections to ensure that employee parking could be maintained during construction. Please feel free to contact us if you have any inquiries. [Case Overview] ■ Project Name: 2018 (H30) Fiscal Year Private Factory Employee Parking Lot Greening Project ■ Location: Hyogo Prefecture ■ Construction Date: March 2019 (R1) ■ Area: 400m2 ■ Purpose: Parking Lot *For more details, please refer to the related links or feel free to contact us.

  • Paving of sidewalks, roads, parking lots and stadiums

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

【Construction Example】Greening of a parking lot that can be completed in a short period and with minimal yard space.

The construction period can be shortened, and even if there are no operating factories or alternative parking spaces available, it is possible to carry out the work with minimal yard space!

In the fiscal year 2022 (R4), we would like to introduce a case where the "Tafutafu Park 55" green parking method was implemented in the greening construction of a private factory employee parking lot. This method was adopted because it minimizes the removal of existing asphalt and can be constructed without affecting the operational factory. We excavated 55mm of the existing asphalt and installed our product. This method does not require the stripping of existing pavement such as asphalt or earthworks, allowing for a reduction in removal and disposal costs. 【Case Overview】 ■ Project Name: 2022 (R4) Fiscal Year Private Factory Employee Parking Lot Greening Construction ■ Location: Osaka Prefecture ■ Construction Date: October 2022 (R4) ■ Area: 1330m2 ■ Purpose: Parking Lot *For more details, please refer to the related links or feel free to contact us.

  • Paving of sidewalks, roads, parking lots and stadiums

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Case] Greening of Employee Parking Lot Due to Insufficient Green Space for New Building Construction

An example of a green parking lot that prevents soil compaction due to vehicle pressure and maintains a root growth layer!

In the 2020 fiscal year, we would like to introduce a case where the integrated base layer parking greening method "Tafutafu Park" was implemented in the greening work of a private factory employee parking lot. Due to the construction of a new building on the site, there was a shortage of green space, so the employee parking lot was greened. With limited yard space on the site, we were able to carry out the work in small batches without affecting the factory's operations. 【Case Overview】 ■ Project Name: 2020 Fiscal Year Private Factory Employee Parking Lot Greening Work ■ Location: Osaka Prefecture ■ Construction Date: December 2020 ■ Area: 2085m2 ■ Purpose: Parking Lot *For more details, please refer to the related links or feel free to contact us.

  • Paving of sidewalks, roads, parking lots and stadiums

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Example] Shortened construction period for embankment work (coastal protection and greening work in one process)

Corresponds to a flow velocity of 5 m/s up to the vegetation area! Demonstrates high-level bank protection functionality immediately after construction.

This is a case study of the installation of the grass-covered geotextile "Grit Saver" at the Hiji River embankment construction in the Suda area. The project was commissioned by the Ozu Civil Engineering Office and carried out in Ehime Prefecture. The product was installed in areas with a flow velocity of 3 to 5 m/s, which were previously unembanked. This method allows for the completion of both bank protection and greening work in a single process, thereby shortening the construction period. [Case Overview] ■ Project Name: Hiji River Embankment Construction, Suda Area ■ Location: Ehime Prefecture ■ Construction Date: July 2023 (Year 5 of Reiwa) ■ Quantity: 4,400 m² ■ Purpose: Other *For more details, please refer to the related links or feel free to contact us.

  • River construction

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Example] Around the playground equipment. The grass does not wither even when the children run around.

Construction in March 2018 (Heisei 30). An example of installing grass protection materials simultaneously with grass installation around the playground equipment.

In the fiscal year 2017 (H29), we would like to introduce a case where the durable pressure-resistant turf protection mat "Tough Tough Guard" was installed at Yokomichi Park. This project was commissioned by the Nagakute City Hall and carried out in Aichi Prefecture. Turf protection material was installed simultaneously with the turf construction around the playground equipment. Please feel free to contact us when you need our services. 【Case Overview】 ■ Project Name: Yokomichi Park in the fiscal year 2017 (H29) ■ Location: Aichi Prefecture ■ Construction Date: March 2018 (H30) ■ Area: 340m2 ■ Purpose: Turf plaza *For more details, please refer to the related links or feel free to contact us.

  • Other park materials

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration
Prev 1...56789 Next
  • Contact this company

    Contact Us Online
  • Before making an inquiry

    Download PDF

Products

  • Search for Products

Company

  • Search for Companies

Special Features

  • Special Features

Ranking

  • Overall Products Ranking
  • Overall Company Ranking

support

  • site map
IPROS
  • privacy policy Regarding external transmission of information
  • terms of service
  • About Us
  • Careers
  • Advertising
IPROS Services
  • >IPROS GMS | Search site for the manufacturing industry
  • >IPROS | Search site for the B2B industry
COPYRIGHT © 2001-2026 IPROS CORPORATION ALL RIGHTS RESERVED.
Please note that the English text on this page is automatically translated and may contain inaccuracies.