1~2 item / All 2 items
Displayed results
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationContact this company
Contact Us Online1~2 item / All 2 items
There are various methods for earthquake countermeasures, and our company has developed and is manufacturing and selling seismic retrofit slit materials that are inserted between the columns cut by cutter work and the secondary walls. Buildings constructed after June 1, 1981, under the "New Seismic Design Method," are designed to include seismic slits to prevent "shear failure due to short columns." For buildings constructed before that date that require seismic retrofitting, options include brace reinforcement and cutter work. To prevent major earthquake disasters, we encourage you to consider this as one of the safety measures for existing buildings.
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationAt our company, it is natural for seismic slit materials to demonstrate their effectiveness during an earthquake, but we believe it is important that they continue to be effective for a long time without the need for large-scale repairs after the earthquake. Based on the above considerations, we propose the use of complete slit materials.
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registration