[Case Study of Pile Navi H] Construction of Detour Road at Toroko Bridge, Shibecha Town
During the construction of the detour road for National Route 391 in Shibecha Town at the Torro Bridge, the vertical direction of the piles was checked during the installation of the temporary bridge.
■Purpose and Evaluation of the Introduction of Pile Navi Cloud-H Until now, we have been using a transit to check in the vertical direction, but there were several challenges. First, it was difficult to grasp the differences from the accurate design values in real-time during the pouring work. Additionally, the visibility of the transit was poor at night or in dark places, and there was also the issue that measurement results could vary depending on the skill of the observer. Overall, I feel that it has helped improve the accuracy of shape management, and the ability to operate it from a distance using a tablet PC has contributed to labor reduction. The system's operation felt intuitive and easy to understand, giving a user-friendly impression. In summary, I would rate it at about 80 points.
- Company:計測ネットサービス
- Price:Other