IPM Method Case Study: Repair Work on Embankment Bridge
This is an introduction to the IPH method (Internal Pressure Filling Joint Reinforcement Method). Case study of the repair work on a bridge over a levee.
This is an introduction to the IPH method (Internal Pressure Filling Joint Reinforcement Method) case study (construction). 【Project Name】 Repair Work for the Tsutsumi Bridge 【Construction Period】 October 3, 2015 - October 29, 2015 【Project Overview】 Repair of floating and honeycomb defects in the newly constructed box culvert and water leakage sealing. 【Project Purpose】 Repair of areas with poor concrete quality. *For more details, please refer to the PDF document or feel free to contact us.
- Company:中日建設株式会社/一般社団法人 IPH工法協会
- Price:Other