Shortened construction period! Wall panel with sash 'NEO SMART PANEL'
Achieved a reduction of 11 days in construction time! The "wall panel" that integrates sash and insulation significantly reduces the burden on carpenters!
Among the carpenter's jobs, the ones that are heavy and dangerous are the installation of "intermediate studs, window sills, structural panels, window frames, and insulation materials." The "NEO SMART PANEL" integrates these components into a single panel, allowing for crane lifting during installation, significantly reducing the burden on carpenters. At the construction site, the processes for each installation can be streamlined, achieving a reduction of 11 days in the construction schedule and a decrease of 10 man-days in labor. If the entire carpentry period is 2 months, it is possible to shorten the construction time by approximately 25%. For those interested in the "NEO SMART PANEL" with window frames, which achieves high quality and overwhelming labor savings for traditional construction methods, please feel free to consult us. 【Features】 ■ Intermediate studs, structural panels, insulation materials, and window frames are pre-integrated in the factory. ■ Reduces installation labor and achieves a shorter construction schedule. ■ Ensures stable construction quality that is not affected by the skill of the workers. ■ Allows for flat stacking during delivery, improving delivery efficiency and reducing transportation costs. Delivery is possible nationwide through partner factories! *For more details, please refer to the materials. Feel free to contact us as well.
- Company:セブン工業
- Price:Other