[Underfloor Heating Construction Example] PTC Pokara, Nagaoka City, Niigata Prefecture (New Nursery Construction Project)
The construction of the new daycare center in Nagaoka City involved floor heating work with 150 sheets in each room, hallway, and hall.
After installation, the wiring of the sheet was connected under the floor and taped. Additionally, the wires were routed through the wall where the controller will be installed, and measurements of insulation resistance and synthetic resistance were taken to confirm there were no issues. Once the interior was completed, the controllers were installed in various locations, and the project was finished. *For more details, please download the PDF or feel free to contact us.*